Block 3727, lot 012
1122 Howard St
- City’s use
- Industrial
- Built
- 1925
- Stories
- 3
- Rooms
- 3 bathrooms
- Lot
- 4,499 sq ft
- Zoning
- SLR
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 19, 2018 | Never finaled issued May 2018, no final | 1122 Howard St | Bonilla Construction | to comply with nov 201544111 - revision to 201504234416 relocate accessible restroom at third flr maher naDetails
to comply with nov 201544111 - revision to 201504234416 relocate accessible restroom at third flr maher na | $12,000 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 1122 Howard St | street spaceDetails
street space | ||
| Apr 23, 2015 | Completed final sign-off Jul 2018 | 1122 Howard St | Bonilla Construction | to comply with nov# 201544111 @ 3rd floor legalize photo studio us, renovate (e) restroom add shower add new restroom add 1hr rated interior partition around (e) stair add 1 hr rated walls & doors at (e) elevator.Details
to comply with nov# 201544111 @ 3rd floor legalize photo studio us, renovate (e) restroom add shower add new restroom add 1hr rated interior partition around (e) stair add 1 hr rated walls & doors at (e) elevator. | $35,000 |
| Dec 3, 2014 | Expired or cancelled cancelled Jan 2026 | 1122 Howard St | replace existing storefront glazing with new aluminum storefront glazing. new interior partitions and lighting; maher n/a.Details
replace existing storefront glazing with new aluminum storefront glazing. new interior partitions and lighting; maher n/a. | $48,000 | |
| Jul 7, 2011 | Expired or cancelled suspend Apr 2015 | 1122 Howard St | 3rd. flr.: adding non-bearing walls for storage & open office & showroom studio for photography shots.Details
3rd. flr.: adding non-bearing walls for storage & open office & showroom studio for photography shots. | $10,000 | |
| Sep 15, 2010 | Completed final sign-off Oct 2010 | 1122 Howard St | ground flr., 2nd. & 3rd. flr: tile bathroom w/6" cove (no other work).Details
ground flr., 2nd. & 3rd. flr: tile bathroom w/6" cove (no other work). | $8,000 | |
| Sep 14, 2010 | Completed final sign-off Oct 2010 | 1122 Howard St | take out plywood front. put back glass window w/iron barDetails
take out plywood front. put back glass window w/iron bar | $4,000 | |
| Apr 23, 2009 | Expired or cancelled cancelled Jan 2026 | 1122 Howard St | revision to app#200902242763. new ramp at new accesable bathroom.Details
revision to app#200902242763. new ramp at new accesable bathroom. | ||
| Feb 24, 2009 | Completed final sign-off Jun 2009 | 1122 Howard St | Nabi Construction & Engineering Inc | strengthen north wall pilasters and footingsDetails
strengthen north wall pilasters and footings | $30,000 |
| Dec 23, 2008 | Expired or cancelled cancelled Nov 2011 | 1122 Howard St | Nabi Construction & Engineering Inc | voluntary seismic upgrade. 3 moment frames, anchors at 3rd floor level, remodel 3 restrooms to make it accessibleDetails
voluntary seismic upgrade. 3 moment frames, anchors at 3rd floor level, remodel 3 restrooms to make it accessible | $110,000 |
| Jan 16, 2003 | Completed final sign-off Feb 2003 | 1122 Howard St | Safeway Roofing & Siding Co. | reroofingDetails
reroofing | $26,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bonilla Construction (2), Nabi Construction & Engineering Inc (2), Safeway Roofing & Siding Co.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.