Block 3726, lot 020
1050 Howard St
- City’s use
- Industrial
- Built
- 1925
- Stories
- 2
- Rooms
- 2 bathrooms
- Lot
- 4,046 sq ft
- Zoning
- SLR
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 1, 2012 | Completed final sign-off Mar 2012 | 1050 Howard St | Pedroli Construction | renew permit application # 200910239749 to obtain final inspectionDetails
renew permit application # 200910239749 to obtain final inspection | |
| Dec 20, 2011 | Completed final sign-off Mar 2012 | 1050 Howard St | Pedroli Construction | to obtain final inspection for work approved under app #201011225469. all work is complete.Details
to obtain final inspection for work approved under app #201011225469. all work is complete. | |
| Nov 22, 2010 | Expired or cancelled expired Mar 2012 | 1050 Howard St | Pedroli Construction | revision to permit 2009-1023-9749 for field changes: install partial height walls @ packaging area, (n) electrical outlets, (n) guardrail @ (e) door, change equipment location.Details
revision to permit 2009-1023-9749 for field changes: install partial height walls @ packaging area, (n) electrical outlets, (n) guardrail @ (e) door, change equipment location. | $600 |
| Oct 23, 2009 | Expired or cancelled expired Mar 2012 | 1050 Howard St | Ken Hughes General Cont. | reclasify s2 space to f1 space for wholesale coffee roaster. install new gas meter room. gas service. demolis (e) unused stair. install new door, floor, wall surface @ roaster.Details
reclasify s2 space to f1 space for wholesale coffee roaster. install new gas meter room. gas service. demolis (e) unused stair. install new door, floor, wall surface @ roaster. | $5,000 |
| Dec 2, 2008 | Completed final sign-off Dec 2008 | 1050 Howard St | Krueger Bros Builders Inc. | revision to 200804089091, provide roof truss framing. revision with prefab truss and add support detail for trussesDetails
revision to 200804089091, provide roof truss framing. revision with prefab truss and add support detail for trusses | |
| Apr 8, 2008 | Completed final sign-off Nov 2008 | 1050 Howard St | revision to application 200710306871, add details for pre-engineered truss detail for the roof.Details
revision to application 200710306871, add details for pre-engineered truss detail for the roof. | ||
| Oct 30, 2007 | Completed final sign-off Dec 2008 | 1050 Howard St | restoration of fire damaged warehouse/office. upgrade accessible entrance, ramps, stairs, and restroom on 1st floor to full compliance. seismic upgrade for entire bldg.Details
restoration of fire damaged warehouse/office. upgrade accessible entrance, ramps, stairs, and restroom on 1st floor to full compliance. seismic upgrade for entire bldg. | $180,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pedroli Construction (3), Ken Hughes General Cont., Krueger Bros Builders Inc.
- Architects
- Charles Ng (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.