Block 3707, lot 025
95 03rd St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 4, 2019 | Completed final sign-off May 2019 | 95 03rd St | Sabah International Incorporated | 2nd floor: add (8) speaker strobes. ref# 2018-0802-6243>Details
2nd floor: add (8) speaker strobes. ref# 2018-0802-6243> | $11,378 |
| Feb 13, 2019 | Completed final sign-off Jul 2019 | 95 03rd St | Performance Air Service Inc | 2nd fl: duct modificationm new registers and grills. ref pa #201808026243.Details
2nd fl: duct modificationm new registers and grills. ref pa #201808026243. | $40,000 |
| Jan 29, 2019 | Completed final sign-off Feb 2019 | 95 03rd St | Pacific Coast Fire | 2nd/f: relocate 13 fire sprinkler heads for new office. ref t.i. pa #201808026243. maher n/a.Details
2nd/f: relocate 13 fire sprinkler heads for new office. ref t.i. pa #201808026243. maher n/a. | $5,400 |
| Aug 2, 2018 | Completed final sign-off Jul 2019 | 95 03rd St | Vulcan Construction Inc | ti and demo 2nd fl: add additional offices to open areas of floor plan. mep, sprinklers and fire alarm separate permitDetails
ti and demo 2nd fl: add additional offices to open areas of floor plan. mep, sprinklers and fire alarm separate permit | $250,000 |
| Jun 11, 2018 | Completed final sign-off Nov 2018 | 95 03rd St | Zebra Awning Co Inc | install 1 painted sign onto (e) awning "oren's hummus"Details
install 1 painted sign onto (e) awning "oren's hummus" | $2,000 |
| Jun 11, 2018 | Completed final sign-off Nov 2018 | 95 03rd St | Zebra Awning Co Inc | install 1 awning measuring 4'h x 11'-9w x 34: dDetails
install 1 awning measuring 4'h x 11'-9w x 34: d | $2,000 |
| Apr 24, 2018 | Never finaled issued Jun 2018, no final | 95 03rd St | install 1 illuminated wall lsign on building interior "oren's hummus"Details
install 1 illuminated wall lsign on building interior "oren's hummus" | $2,000 | |
| Apr 24, 2018 | Never finaled issued Jun 2018, no final | 95 03rd St | Sign Of Light | install 1 illuminated single faced wall sign "oren's hummus"Details
install 1 illuminated single faced wall sign "oren's hummus" | $3,000 |
| Sep 18, 2017 | Completed final sign-off Oct 2017 | 95 03rd St | Sabah International Incorporated | 1/f & 2/f- as built fire alarm for permit app#201704194372Details
1/f & 2/f- as built fire alarm for permit app#201704194372 | |
| Jun 29, 2017 | Completed final sign-off Oct 2017 | 95 03rd St | Deacon Corp Of California | revision to 2017-0310-1178 install duct detectors in ductworkDetails
revision to 2017-0310-1178 install duct detectors in ductwork | |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 95 03rd St | Sign Of Light | erect wall mounted single faced illum sign "spaces"Details
erect wall mounted single faced illum sign "spaces" | $3,000 |
| Apr 26, 2017 | Completed final sign-off Oct 2017 | 95 03rd St | Battalion One Fire Protection | add sprinkler protection throughout 2nd level in new ceilings. add sprinkler protection on gr lvel new entryway ceiling. remove existing upright heads above ceilings and utilize 1" outlets to feed new ceiling heads. associated with 201601086652Details
add sprinkler protection throughout 2nd level in new ceilings. add sprinkler protection on gr lvel new entryway ceiling. remove existing upright heads above ceilings and utilize 1" outlets to feed new ceiling heads. associated with 201601086652 | $25,000 |
| Apr 21, 2017 | Completed final sign-off Oct 2017 | 95 03rd St | Deacon Corp Of California | 2/f- 2nd revision to pa#201703101178 for electrical workDetails
2/f- 2nd revision to pa#201703101178 for electrical work | |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 95 03rd St | Sabah International Incorporated | modify existing fire alarm system for 95 03rd st (680 mssion st) as part of the 1st floor lobby and 2nd floor ti - add 40 new ceiling speaker/strobe & 2 new sync module, 5 new ceiling strobes. ref pa 2015-0202-7199Details
modify existing fire alarm system for 95 03rd st (680 mssion st) as part of the 1st floor lobby and 2nd floor ti - add 40 new ceiling speaker/strobe & 2 new sync module, 5 new ceiling strobes. ref pa 2015-0202-7199 | $18,898 |
| Mar 21, 2017 | Completed final sign-off Oct 2017 | 95 03rd St | Deacon Corp Of California | revision to 201601086652Details
revision to 201601086652 | |
| Mar 10, 2017 | Completed final sign-off Oct 2017 | 95 03rd St | Deacon Corp Of California | 1/f & 2/f- revision to 201611102446 mechanical and electrical. relocate grills/diffuser, relocate lights, new laoyout of lightsDetails
1/f & 2/f- revision to 201611102446 mechanical and electrical. relocate grills/diffuser, relocate lights, new laoyout of lights | |
| Nov 10, 2016 | Completed final sign-off Oct 2017 | 95 03rd St | Deacon Corp Of California | suite #200: electrical and mechanical bldg permit #201601086652Details
suite #200: electrical and mechanical bldg permit #201601086652 | |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 95 03rd St | Sign Of Light | attach fabric sign to projecting attachments - double facedDetails
attach fabric sign to projecting attachments - double faced | $2,000 |
| Jan 8, 2016 | Completed final sign-off Oct 2017 | 95 03rd St | Deacon Corp Of California | t/i offices, finishes 1st floor & 2nd floor. mep/fire alarm/sprinkler deferred.Details
t/i offices, finishes 1st floor & 2nd floor. mep/fire alarm/sprinkler deferred. | $2,200,000 |
| Feb 2, 2015 | Never finaled issued Feb 2015, no final | 95 03rd St | Novo Construction Inc | 1st and 2nd floor: interior demo only. ab-017. nonstructural partitions only. t.i. arch, mech, f/a, sprinklers under seperate permit.Details
1st and 2nd floor: interior demo only. ab-017. nonstructural partitions only. t.i. arch, mech, f/a, sprinklers under seperate permit. | $55,000 |
| Apr 12, 2011 | Completed final sign-off May 2011 | 91 03rd St | Arrow Sign Company | to erect non electrical signDetails
to erect non electrical sign | $2,500 |
| Sep 16, 2004 | Never finaled issued Sep 2004, no final | 95 03rd St | additional addressDetails
additional address | ||
| May 12, 2004 | Completed final sign-off May 2004 | 91 03rd St | Arrow Sign Company | to erect a non-electrical signDetails
to erect a non-electrical sign | |
| Mar 23, 2004 | Never finaled issued Mar 2004, no final | 91 03rd St | address assignmentDetails
address assignment |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Deacon Corp Of California (6), Sabah International Incorporated (3), Sign Of Light (3), Arrow Sign Company (2), Zebra Awning Co Inc (2), Battalion One Fire Protection, Novo Construction Inc, Pacific Coast Fire, Performance Air Service Inc, Vulcan Construction Inc
- Architects
- Joseph Remling, Thomas Pirtle Iii
- Engineers
- John Jansons, Kerry Kirchenbauer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.