Block 3655, lot 024
1151 Castro St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 2
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 2,446 sq ft
- Lot
- 2,779 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2014 | Never finaled issued Sep 2014, no final | 1151 Castro St | street spaceDetails
street space | ||
| Sep 15, 2014 | Never finaled issued Sep 2014, no final | 1151 Castro St | street spaceDetails
street space | ||
| Jan 24, 2014 | Completed final sign-off Feb 2016 | 1151 Castro St | Genuine Construction Inc. | revision to 201212126058. exterior facade upgrade and changes. changes to materials and window locationDetails
revision to 201212126058. exterior facade upgrade and changes. changes to materials and window location | |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 1151 Castro St | street spaceDetails
street space | ||
| Nov 8, 2013 | Completed final sign-off Feb 2016 | 1151 Castro St | Genuine Construction Inc. | proposed proj is a structural redesign of a previously approved proj. no changes to the previously approved proj 201305227661 arch design are proposed. jyasf has performed a complete structural design based on the current and proposed conditions at the site & those recommendations are described inDetails
proposed proj is a structural redesign of a previously approved proj. no changes to the previously approved proj 201305227661 arch design are proposed. jyasf has performed a complete structural design based on the current and proposed conditions at the site & those recommendations are described in | $30,000 |
| Jul 29, 2013 | Completed final sign-off Dec 2015 | 1151 Castro St | Magnum Construction Group Inc | install 42 fire sprinkler heads & w/2" comb fire service, new sprinkler system throughout building per nfpa 13-2010. work includes 2" copper 'k' underground.Details
install 42 fire sprinkler heads & w/2" comb fire service, new sprinkler system throughout building per nfpa 13-2010. work includes 2" copper 'k' underground. | $9,000 |
| Jun 3, 2013 | Never finaled issued Jun 2013, no final | 1151 Castro St | street spaceDetails
street space | ||
| May 22, 2013 | Completed final sign-off Feb 2016 | 1151 Castro St | Amherst Associates Const | voluntary structural strenthening; upgrade framing for future penthouse addition per plan.Details
voluntary structural strenthening; upgrade framing for future penthouse addition per plan. | $5,000 |
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 1151 Castro St | street space permitDetails
street space permit | ||
| Apr 8, 2013 | Completed final sign-off Feb 2016 | 1151 Castro St | S F Garage Company Inc. | revision to app#201206062004 for new proposed wood posts to extg steel beam connection details.Details
revision to app#201206062004 for new proposed wood posts to extg steel beam connection details. | |
| Mar 4, 2013 | Never finaled issued Mar 2013, no final | 1151 Castro St | street spaceDetails
street space | ||
| Feb 26, 2013 | Completed final sign-off Feb 2016 | 1151 Castro St | S F Garage Company Inc. | revise previous permit app#201206062004. provide shorcrete footing at the back wall. comply with complaint number at 201269629Details
revise previous permit app#201206062004. provide shorcrete footing at the back wall. comply with complaint number at 201269629 | |
| Dec 12, 2012 | Completed final sign-off Feb 2016 | 1151 Castro St | Amherst Associates Const | interior remodel of all three floor per plan.Details
interior remodel of all three floor per plan. | $9,000 |
| Dec 12, 2012 | Completed final sign-off Feb 2016 | 1151 Castro St | Amherst Associates Const | exterior facade upgrade and changesDetails
exterior facade upgrade and changes | $9,000 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 1151 Castro St | street space permitDetails
street space permit | ||
| Oct 10, 2012 | Never finaled issued Oct 2012, no final | 1151 Castro St | street space permitDetails
street space permit | ||
| Jun 6, 2012 | Completed final sign-off Feb 2016 | 1151 Castro St | S F Garage Company Inc. | revision to pa# 201205039756, revise retaining wall height & shear wall location.Details
revision to pa# 201205039756, revise retaining wall height & shear wall location. | $5,000 |
| May 3, 2012 | Completed final sign-off Feb 2016 | 1151 Castro St | S F Garage Company Inc. | construct (n) garage & garage door @ gound floor. provide (n) sidewalk curb cut. replace (e) wood beam & psot with (n) steel beam & post.repair (e) concrete wall @ north & west side in kind.Details
construct (n) garage & garage door @ gound floor. provide (n) sidewalk curb cut. replace (e) wood beam & psot with (n) steel beam & post.repair (e) concrete wall @ north & west side in kind. | $23,000 |
| May 24, 2004 | Never finaled issued May 2004, no final | 1153 Castro St | enclose lightwell space with a floor and skylight added to (e) kitchenDetails
enclose lightwell space with a floor and skylight added to (e) kitchen | $2,500 | |
| Jun 17, 2003 | Never finaled issued Jun 2003, no final | 1151 Castro St | Mullins General Construction & Fine Pain | remove and replace stucco at base of south side of bldg only saw cut stucco at base of bays installDetails
remove and replace stucco at base of south side of bldg only saw cut stucco at base of bays install | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S F Garage Company Inc. (4), Amherst Associates Const (3), Genuine Construction Inc. (2), Magnum Construction Group Inc, Mullins General Construction & Fine Pain
- Engineers
- Horon Lee, Jahandar Yadegar
- Authorized agent-otherss
- Ams Associates
Find contractors for work like this