Block 3619, lot 036
975 Church St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 16, 2008 | Completed final sign-off Oct 2008 | 975 Church St | to comply with physical inspection 3r report #3r 5107 except items #9 and #10 which were completed under app #200803177312Details
to comply with physical inspection 3r report #3r 5107 except items #9 and #10 which were completed under app #200803177312 | $2,000 | |
| Mar 17, 2008 | Completed final sign-off Oct 2008 | 975 Church St | Streiffer Burnham Const., Inc. | comply with phisical inspection report #3r-5107 items# 9&10 and electrical requirements for lower unit to legalize ex.study room that was converted from storage space without permit.Details
comply with phisical inspection report #3r-5107 items# 9&10 and electrical requirements for lower unit to legalize ex.study room that was converted from storage space without permit. | $4,500 |
| Mar 10, 2008 | Completed final sign-off Jun 2008 | 975 Church St | Jjj & K Inc./Dba: Alexander Company | replace 10 windows size for size,9 marvin wndw prefinish exterior and vinyl wndw. all wndw visable from street to be replace with marvin wood clad windowsDetails
replace 10 windows size for size,9 marvin wndw prefinish exterior and vinyl wndw. all wndw visable from street to be replace with marvin wood clad windows | $10,723 |
| Jul 30, 2007 | Completed final sign-off Sep 2007 | 977 Church St | Jjj & K Inc./Dba: Alexander Company | replace 5 windows, visible from street. size for size for wood tilt packs & 4 windows not visible from street for pre-finish exterior, wood interior. size for size. all window will remain double hung. u-factor maximum 0.67.Details
replace 5 windows, visible from street. size for size for wood tilt packs & 4 windows not visible from street for pre-finish exterior, wood interior. size for size. all window will remain double hung. u-factor maximum 0.67. | $9,787 |
| Mar 18, 2003 | Never finaled issued Mar 2003, no final | 975 Church St | street space and sidewalk permitDetails
street space and sidewalk permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jjj & K Inc./Dba: Alexander Company (2), Streiffer Burnham Const., Inc.
- Engineers
- Don David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.