Block 3595, lot 069
2391 Mission St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 7,470 sq ft
- Lot
- 2,375 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 9, 2024 | Completed final sign-off Feb 2024 | 2391 Mission St | Brickstone Construction Llc | reroofingDetails
reroofing | $25,000 |
| Feb 8, 2024 | Completed final sign-off Mar 2024 | 2391 Mission St | to comply w/ nov 202418618 interior repairs, replace wood siding and any damaed compomisd underlaymentDetails
to comply w/ nov 202418618 interior repairs, replace wood siding and any damaed compomisd underlayment | $6,500 | |
| Aug 9, 2023 | Completed final sign-off Aug 2023 | 2393 Mission St | unit #1: to comply with nov #202311451 item 2. replace window.Details
unit #1: to comply with nov #202311451 item 2. replace window. | $300 | |
| Jun 21, 2023 | Never finaled filed Jun 2023, never issued | 2391 Mission St | change of occupancy type: commercial ground floor tenant improvement. change of use from business retail to art gallery / art events. new rated egress hallway. new accessible restroom. mep deferred. no structural work.Details
change of occupancy type: commercial ground floor tenant improvement. change of use from business retail to art gallery / art events. new rated egress hallway. new accessible restroom. mep deferred. no structural work. | $117,000 | |
| Dec 9, 2022 | Completed final sign-off Aug 2023 | 2391 Mission St | North South Construction Inc | abe per ordinance - install single door c/w power door operator replace thresholdDetails
abe per ordinance - install single door c/w power door operator replace threshold | $6,000 |
| Jan 8, 2020 | Completed final sign-off Feb 2020 | 2393 Mission St | unit #1: to comply w/ nov 201959201. remove lofts from walls by taking out screws in joists and taking all joists off walls. resulting in no structures attached to walls.Details
unit #1: to comply w/ nov 201959201. remove lofts from walls by taking out screws in joists and taking all joists off walls. resulting in no structures attached to walls. | $1,000 | |
| Aug 7, 2019 | Completed final sign-off Aug 2019 | 2393 Mission St | repair entry stair less than 50%, inside stairs, not visable from street. to comly with nov#201966492 item #2. maher n/a.Details
repair entry stair less than 50%, inside stairs, not visable from street. to comly with nov#201966492 item #2. maher n/a. | $1,000 | |
| Dec 7, 2006 | Never finaled issued Dec 2006, no final | 2391 Mission St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Aug 28, 2002 | Expired or cancelled expired Jan 2004 | 2393 Mission St | Jjj & K Inc./Dba: Alexander Company | 24 windows to be replaced size for size (front of house) wood to vinyl visible from streetDetails
24 windows to be replaced size for size (front of house) wood to vinyl visible from street | $10,560 |
| Apr 12, 2001 | Completed final sign-off Jun 2001 | 2393 Mission St | remove back stair goint to roof of 1st fl, existing fire escape will serve as 2nd means of egressDetails
remove back stair goint to roof of 1st fl, existing fire escape will serve as 2nd means of egress | ||
| Aug 17, 2000 | Expired or cancelled expired Jun 2001 | 2393 Mission St | remove back stairsDetails
remove back stairs | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brickstone Construction Llc, Jjj & K Inc./Dba: Alexander Company, North South Construction Inc
- Architects
- Daniel Howard, Michael Steiner
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.