Block 3576, lot 015
3412 18th St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 3
- Rooms
- 12 bedrooms, 6 bathrooms
- Building
- 4,590 sq ft
- Lot
- 2,125 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2018 | Completed final sign-off Dec 2018 | 3412 18th St | Gary Liu | work only on unit #3412 on 2nd flr. remodel (e) kitchen and add new bath. remodel (e) bathDetails
work only on unit #3412 on 2nd flr. remodel (e) kitchen and add new bath. remodel (e) bath | $25,000 |
| Jan 26, 2017 | Completed final sign-off Jan 2018 | 3412 18th St | Burradell Construction Inc---See Notes | foundation upgrade (voluntary)Details
foundation upgrade (voluntary) | $20,000 |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 3412 18th St | Master Roofing Systems Inc. | reroofingDetails
reroofing | $9,000 |
| Sep 25, 2014 | Completed final sign-off Dec 2014 | 3416 18th St | Allied Teamwork Construction Co | remodel (e) kitchen and bathroom, convert closet to add a new bathroom per plan. replace furnace. kitchen lighting and control per cec 150(k). maher n/a.Details
remodel (e) kitchen and bathroom, convert closet to add a new bathroom per plan. replace furnace. kitchen lighting and control per cec 150(k). maher n/a. | $30,000 |
| Aug 21, 2014 | Never finaled issued Aug 2014, no final | 3414 18th St | street spaceDetails
street space | ||
| Aug 5, 2014 | Completed final sign-off Aug 2014 | 3414 18th St | Allied Teamwork Construction Co | reduce scope of work for pa#201404112999 on 3/f unit #3414, 18th street, cancel wall opening at kitchen to living room, no new beams & posts work perform. n/a ordinance #155-13Details
reduce scope of work for pa#201404112999 on 3/f unit #3414, 18th street, cancel wall opening at kitchen to living room, no new beams & posts work perform. n/a ordinance #155-13 | |
| Apr 11, 2014 | Completed final sign-off Aug 2014 | 3414 18th St | Allied Teamwork Construction Co | 3rd floor unit #3414 18th street. 1)remodel extg kitchen and add new bath. 2)remove part of extg load bearing wall and add new beam and posts, 3)add new forced air gas furnace. n/a for the maher ordinance #155-13Details
3rd floor unit #3414 18th street. 1)remodel extg kitchen and add new bath. 2)remove part of extg load bearing wall and add new beam and posts, 3)add new forced air gas furnace. n/a for the maher ordinance #155-13 | $35,000 |
| Mar 12, 2012 | Never finaled issued Mar 2012, no final | 3414 18th St | Thd At-Home Services Inc/Home Depot | repalce 6 windows, visible from the street, no structural changes, max u factor .40Details
repalce 6 windows, visible from the street, no structural changes, max u factor .40 | $6,188 |
| Oct 28, 2009 | Never finaled issued Jan 2010, no final | 3412 18th St | Clear Channel Outdoor | legalize (e) 12'x25' west facing wall sign, displaying outdoor advertisingDetails
legalize (e) 12'x25' west facing wall sign, displaying outdoor advertising | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Allied Teamwork Construction Co (3), Burradell Construction Inc---See Notes, Clear Channel Outdoor, Gary Liu, Master Roofing Systems Inc., Thd At-Home Services Inc/Home Depot
- Engineers
- Vincent Kelly
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.