Block 3568, lot 035
178 Albion St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2015 | Completed final sign-off Nov 2015 | 178 Albion St | Modulus Company | to comply with reprot of physical inspection application cc - 7808: provide proper guardrail protection at tthe rear stairs.Details
to comply with reprot of physical inspection application cc - 7808: provide proper guardrail protection at tthe rear stairs. | |
| Jun 22, 2009 | Completed final sign-off Jul 2009 | 180 Albion St | perform termite work per markoff pest control report# 9457. item# 1 & # 2 on report. approx 5' x 7' area.Details
perform termite work per markoff pest control report# 9457. item# 1 & # 2 on report. approx 5' x 7' area. | $1,800 | |
| Aug 23, 2007 | Completed final sign-off Aug 2008 | 178 Albion St | revision to permit under construction app 200604219544, change windows at front to vinyl, dual pane, same desighn, revise roof framing per plans, remodel kitche, replace appliances in kind, replacce studs in kind within ex walls where rot or termiteDetails
revision to permit under construction app 200604219544, change windows at front to vinyl, dual pane, same desighn, revise roof framing per plans, remodel kitche, replace appliances in kind, replacce studs in kind within ex walls where rot or termite | $30,000 | |
| Jul 3, 2007 | Completed final sign-off Aug 2008 | 178 Albion St | revision to permit application #2007/0418/9128. minor garage enlargement to existing light const and minor framing changes removal of partitions between two existing garagesDetails
revision to permit application #2007/0418/9128. minor garage enlargement to existing light const and minor framing changes removal of partitions between two existing garages | $5,000 | |
| Apr 18, 2007 | Completed final sign-off Aug 2008 | 178 Albion St | expand garage at ground level within existing building envelope, remove posts and wall partitions, new steel beams,footings. sprinklers under sep permitDetails
expand garage at ground level within existing building envelope, remove posts and wall partitions, new steel beams,footings. sprinklers under sep permit | $25,000 | |
| Apr 21, 2006 | Completed final sign-off Aug 2008 | 178 Albion St | site permit. extend 2 entry steps at ground level. provide roof deck (500 sq. ft) . extend front access stairs to roof through partially covered penthouse.Details
site permit. extend 2 entry steps at ground level. provide roof deck (500 sq. ft) . extend front access stairs to roof through partially covered penthouse. | $20,000 | |
| Jul 19, 2004 | Never finaled issued Jul 2004, no final | 178 Albion St | scaffoldDetails
scaffold |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Modulus Company
- Engineers
- Val Rabichev (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.