Block 3558, lot 036
201 Sanchez St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 7
- Rooms
- 4 bathrooms
- Building
- 6,495 sq ft
- Lot
- 2,512 sq ft
- Zoning
- UPMKT
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2025 | Completed final sign-off Aug 2025 | 201 Sanchez St | S.F.A-1 Roofing & Maintenance | re-roofing with hot works.Details
re-roofing with hot works. | $32,800 |
| Jun 21, 2023 | Never finaled issued Jun 2023, no final | 207 Sanchez St | Yada Signs Co | sign only: awning vinyl lettering "people hand & nails spa"Details
sign only: awning vinyl lettering "people hand & nails spa" | |
| Jun 21, 2023 | Completed final sign-off Nov 2023 | 207 Sanchez St | Yada Signs Co | replace (e) awning with similar copy, 17x4ft including framing.Details
replace (e) awning with similar copy, 17x4ft including framing. | $1,500 |
| Feb 1, 2023 | Completed final sign-off Jun 2023 | 2199 Market St | Quayle And Company | install an awning, 50 ft x 14 ft, 3 ft tall. base is 9 ft frome the sidewalk. 3/8 om bolt. canvas is make of sunbrellaDetails
install an awning, 50 ft x 14 ft, 3 ft tall. base is 9 ft frome the sidewalk. 3/8 om bolt. canvas is make of sunbrella | $1,500 |
| Feb 1, 2023 | Completed final sign-off Aug 2024 | 2199 Market St | Quayle And Company | "custom sofa co" paint on canvas, comply w/complain 202302783Details
"custom sofa co" paint on canvas, comply w/complain 202302783 | |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 205 Sanchez St | per pg&e and building record, add residential address 205 sanchez st and commercial 207a sanchez st for abe program.Details
per pg&e and building record, add residential address 205 sanchez st and commercial 207a sanchez st for abe program. | ||
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 2199 Market St | J B Signs | install (2) illuminated led channel letter sets/front lit. maher naDetails
install (2) illuminated led channel letter sets/front lit. maher na | $4,000 |
| Aug 11, 2017 | Completed final sign-off Aug 2017 | 201 Sanchez St | Sederap's Drywall Inc. | replace 2 posts 4x4 on the backk stairs and some small dry rot wood about 10% of the back stairs.Details
replace 2 posts 4x4 on the backk stairs and some small dry rot wood about 10% of the back stairs. | $3,500 |
| Feb 21, 2014 | Never finaled issued Feb 2014, no final | 2195 Market St | street space permit and sidewalk permitDetails
street space permit and sidewalk permit | ||
| Aug 22, 2013 | Never finaled issued Aug 2013, no final | 2195 Market St | street spaceDetails
street space | ||
| Jul 6, 2012 | Completed final sign-off Sep 2012 | 207 Sanchez St | Alex R Construction | work in unit a: replace 3 windows visble from street.Details
work in unit a: replace 3 windows visble from street. | $1,050 |
| May 24, 2012 | Never finaled issued May 2012, no final | 2199 Market St | Pan Sign Co | to erect electric single faced wall signsDetails
to erect electric single faced wall signs | $1,500 |
| May 24, 2012 | Never finaled issued May 2012, no final | 2199 Market St | Pan Sign Co | install electric wall sign, verizon wirelessDetails
install electric wall sign, verizon wireless | $1,500 |
| Feb 14, 2012 | Completed final sign-off Apr 2012 | 207 Sanchez St | Wong Yiu Construction | change of use, from retail to hair/nail salon, new t.i. , new ada restroom, now bearing partion walls, plumbing, electrcial, relocate (e) elect heater.Details
change of use, from retail to hair/nail salon, new t.i. , new ada restroom, now bearing partion walls, plumbing, electrcial, relocate (e) elect heater. | $15,000 |
| Sep 26, 2003 | Never finaled issued Sep 2003, no final | 201 Sanchez St | street spaceDetails
street space | ||
| Dec 4, 2001 | Completed final sign-off Jan 2002 | 201 Sanchez St | revision to 200108095705: close windows on lot line line @ 2nd levelDetails
revision to 200108095705: close windows on lot line line @ 2nd level | ||
| Aug 9, 2001 | Completed final sign-off Jan 2002 | 203 Sanchez St | close windows at lot line on 3rd floor. per inspector request. replace two line existing windows onDetails
close windows at lot line on 3rd floor. per inspector request. replace two line existing windows on | $4,000 | |
| Jan 10, 2001 | Completed final sign-off Jun 2001 | 203 Sanchez St | Darin C Kieth Dba: Howe Furnace | replace heater w/75,000 b.t.u. forced air furnace using existing gas. provide combustion air for furDetails
replace heater w/75,000 b.t.u. forced air furnace using existing gas. provide combustion air for fur | $5,300 |
| Sep 14, 2000 | Completed final sign-off Apr 2002 | 201 Sanchez St | M. Gaehwiler Construction Inc | underpin fndtn at rear refer to 9222330sDetails
underpin fndtn at rear refer to 9222330s | $5,000 |
| Apr 26, 2000 | Expired or cancelled expired Oct 2000 | 201 Sanchez St | Golden Gate Roofing | reroofingDetails
reroofing | $13,400 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.