Block 3555, lot 058
66 Albion St
- City’s use
- Multi-Family Residential
- Built
- 1940
- Stories
- 2
- Units
- 4
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 4,180 sq ft
- Lot
- 3,049 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 7, 2020 | Completed final sign-off Mar 2021 | 66 Albion St | Afc Construction Inc | replace existing 12 windows to aluminum in the front of the building. single hinge on the side and double hung on the middle windowsDetails
replace existing 12 windows to aluminum in the front of the building. single hinge on the side and double hung on the middle windows | $13,596 |
| May 7, 2019 | Completed final sign-off Sep 2019 | 66 Albion St | Savidge Construction Inc. | soft story seismic retrofit first floor only. revision to pa# 201803093320Details
soft story seismic retrofit first floor only. revision to pa# 201803093320 | |
| Mar 9, 2018 | Completed final sign-off Sep 2019 | 66 Albion St | Savidge Construction Inc. | soft story retrofit in residential area, 1st floor only. adding flywood for shear walls, & some (n) footings. design criteria: 2016 cebs appendix a-4Details
soft story retrofit in residential area, 1st floor only. adding flywood for shear walls, & some (n) footings. design criteria: 2016 cebs appendix a-4 | $75,000 |
| Sep 30, 2002 | Completed final sign-off Feb 2003 | 66 Albion St | D C S Construction Services Inc | rapair rear stair as needed approx 50% of 3 stories remove damaged/cracked stucco as needed and replDetails
rapair rear stair as needed approx 50% of 3 stories remove damaged/cracked stucco as needed and repl | $2,500 |
| Sep 5, 2002 | Completed final sign-off Feb 2003 | 66 Albion St | D C S Construction Services Inc | remove dry rotted framing at litwell deck/roof area. repair as needed.Details
remove dry rotted framing at litwell deck/roof area. repair as needed. | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D C S Construction Services Inc (2), Savidge Construction Inc. (2), Afc Construction Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.