Block 3545, lot 093
25 Ramona Av
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 16, 2018 | Completed final sign-off Nov 2018 | 25 Ramona Av | to comply with physical inspection report #cc8307Details
to comply with physical inspection report #cc8307 | $1,000 | |
| Jun 23, 2017 | Never finaled issued Jun 2017, no final | 25 Ramona Av | street space. | ||
| May 11, 2017 | Completed final sign-off Jul 2017 | 25 Ramona Av | Bay C T Construction Inc. | comply to nov#201637644, replace existing front facade window and install new wood windows. u factor .32 3 windows totalDetails
comply to nov#201637644, replace existing front facade window and install new wood windows. u factor .32 3 windows total | $5,000 |
| Mar 14, 2017 | Never finaled issued Mar 2017, no final | 25 Ramona Av | street space permit | ||
| Nov 8, 2016 | Completed final sign-off Jul 2017 | 25 Ramona Av | Bay C T Construction Inc. | revision to approved bldg permit #201501125413 per plan. repair (e) exterior stair to rear yard in kind and 4th floor bay window dryrot repair in kind.Details
revision to approved bldg permit #201501125413 per plan. repair (e) exterior stair to rear yard in kind and 4th floor bay window dryrot repair in kind. | $10,000 |
| Sep 2, 2016 | Completed final sign-off May 2017 | 25 Ramona Av | Crime Watch Security Sys Llc | sprinkler waterflow and supervisory system. install new panel heat detector avoe and pull station near panel in the garate area. install minotor modules to tie in warteflow and tamper switches and radio communicator. ref #201607202825 & 201501125413.Details
sprinkler waterflow and supervisory system. install new panel heat detector avoe and pull station near panel in the garate area. install minotor modules to tie in warteflow and tamper switches and radio communicator. ref #201607202825 & 201501125413. | $2,000 |
| Jul 20, 2016 | Completed final sign-off Jul 2017 | 25 Ramona Av | Pro Plumbing | install fire sprinkler system throughout bldg including fire service. ref pa #201501125413-s1.Details
install fire sprinkler system throughout bldg including fire service. ref pa #201501125413-s1. | $27,000 |
| Apr 13, 2016 | Completed final sign-off Jul 2017 | 25 Ramona Av | soft demo bathroom, kitchen, floor finishes carpet, cabinets in ref to bpa#2015-0112-5413. non structural.Details
soft demo bathroom, kitchen, floor finishes carpet, cabinets in ref to bpa#2015-0112-5413. non structural. | $5,000 | |
| Jan 12, 2015 | Completed final sign-off Jul 2017 | 25 Ramona Av | Bay C T Construction Inc. | interior remodel for all flrs. rear 3 story horizontal addition. infill (e) lightwell & enclosed stair space. 4th story vertical addition w/ roof deck @ 3rd flr roof for upper unit. part of interior work under seperate permit.Details
interior remodel for all flrs. rear 3 story horizontal addition. infill (e) lightwell & enclosed stair space. 4th story vertical addition w/ roof deck @ 3rd flr roof for upper unit. part of interior work under seperate permit. | $49,000 |
| Aug 18, 2009 | Completed final sign-off Jul 2010 | 25 Ramona Av | Innovative Windows | remove 2 existing aluminum windows in the back of the home and install 2 new vinyl windows, same size, ufactor 0.67 maxDetails
remove 2 existing aluminum windows in the back of the home and install 2 new vinyl windows, same size, ufactor 0.67 max | $768 |
| Feb 19, 2008 | Completed final sign-off Jun 2008 | 25 Ramona Av | Chongson Construction Co. | unit #25-3rd fl - 1 bedrm in the middle of the house. rmve the plaster on the east & west side, install insulation then install shtrock for the entire bedrm. install more elec outlets, remove (e) wall heater, install furnace in the attic, repl (e)window in the hallway closet, install light & switch.Details
unit #25-3rd fl - 1 bedrm in the middle of the house. rmve the plaster on the east & west side, install insulation then install shtrock for the entire bedrm. install more elec outlets, remove (e) wall heater, install furnace in the attic, repl (e)window in the hallway closet, install light & switch. | $8,500 |
| Sep 24, 2007 | Completed final sign-off Nov 2007 | 25 Ramona Av | A B C Window Contractors | install 2 vinyl windows in kind into existing frame.no change insize or lcoation.windows do not face street. if applicable, bedroom windows will comply with section 310.4 for rescue. all windows will be double pane and have a u factor of 0.30Details
install 2 vinyl windows in kind into existing frame.no change insize or lcoation.windows do not face street. if applicable, bedroom windows will comply with section 310.4 for rescue. all windows will be double pane and have a u factor of 0.30 | $936 |
| Aug 13, 2007 | Completed final sign-off Nov 2007 | 25 Ramona Av | Lee Family Corp | reroofingDetails
reroofing | $9,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay C T Construction Inc. (3), A B C Window Contractors, Chongson Construction Co., Crime Watch Security Sys Llc, Innovative Windows, Lee Family Corp, Pro Plumbing
- Architects
- Xie Xing "Bill" Guan
- Engineers
- Xie Xing Guan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.