Block 3528, lot 011
550 10th St
- City’s use
- Industrial
- Built
- 1988
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 6,465 sq ft
- Lot
- 6,500 sq ft
- Zoning
- SLI
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 15, 2024 | In progress issued Oct 2024 | 550 10th St | Integrity Air Systems Corporation | shop ventilation -1 supply fan and 1 exhaust fan . including duct per planDetails
shop ventilation -1 supply fan and 1 exhaust fan . including duct per plan | $27,000 |
| Dec 28, 2020 | Never finaled issued Feb 2021, no final | 550 10th St | Battalion One Fire Protection | design and install novec fire suppression ssytems to protect machineryDetails
design and install novec fire suppression ssytems to protect machinery | $15,000 |
| Feb 8, 2019 | Completed final sign-off Feb 2019 | 550 10th St | Bay Cities Pyrotector Inc | f/s: install (3) new mechanical tees and (3) new upright fire sprinklers on existing sprinkler lines due to a new hallway being constructed by others. ref bpa #201812148411.Details
f/s: install (3) new mechanical tees and (3) new upright fire sprinklers on existing sprinkler lines due to a new hallway being constructed by others. ref bpa #201812148411. | $8,264 |
| Jan 4, 2019 | Completed final sign-off Dec 2019 | 550 10th St | in reference to pa #201812148411. adding t-24 lighting calcs.Details
in reference to pa #201812148411. adding t-24 lighting calcs. | ||
| Dec 14, 2018 | Completed final sign-off Dec 2019 | 550 10th St | construction of new non load bearing walls in 3 locations to enclose new interior rooms. ele outletsand lighting in new rooms, no chages to exit routes- sprinklers separte permit. sffd manafacturing permit required.Details
construction of new non load bearing walls in 3 locations to enclose new interior rooms. ele outletsand lighting in new rooms, no chages to exit routes- sprinklers separte permit. sffd manafacturing permit required. | $24,000 | |
| Sep 25, 2018 | Never finaled issued Nov 2018, no final | 550 10th St | occupy building in existing condition. connect 3d printing machines.existing sprinkler system to remain; maher naDetails
occupy building in existing condition. connect 3d printing machines.existing sprinkler system to remain; maher na | ||
| Aug 15, 2014 | Never finaled issued Aug 2014, no final | 550 10th St | D C Taylor Co | reroofingDetails
reroofing | $56,839 |
| Mar 24, 2011 | Expired or cancelled cancelled Jan 2026 | 550 10th St | Yerba Buena Builders Inc | 1)new accessible exit at division st.2)install new glass infill in extg overhead door openings at 10th st.3)change door swings. 4)associated disabled access upgrades.5)elect.under seperate permit.Details
1)new accessible exit at division st.2)install new glass infill in extg overhead door openings at 10th st.3)change door swings. 4)associated disabled access upgrades.5)elect.under seperate permit. | $40,000 |
| Sep 29, 2010 | Expired or cancelled cancelled Jan 2026 | 550 10th St | install new glass infill in existing opening on 10tgh st frontage, associated diasabled access upgradesDetails
install new glass infill in existing opening on 10tgh st frontage, associated diasabled access upgrades | $10,000 | |
| Sep 14, 2010 | Expired or cancelled cancelled Jan 2026 | 550 10th St | install glass infill in 2 extg opening on 10th street frontageDetails
install glass infill in 2 extg opening on 10th street frontage | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Battalion One Fire Protection, Bay Cities Pyrotector Inc, D C Taylor Co, Integrity Air Systems Corporation, Yerba Buena Builders Inc
- Architects
- Harvey J Hacker (2)
- Engineers
- Natasha Mogley
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.