Block 3521, lot 003
316 11th St
- City’s use
- Industrial
- Built
- 1924
- Stories
- 2
- Units
- 2
- Lot
- 3,488 sq ft
- Zoning
- SLR
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2013 | Completed final sign-off Aug 2013 | 316 11th St | Security Engineers Inc | sprinkler sytem monitoring upgrade existing system to an adressable system and install notification devicesDetails
sprinkler sytem monitoring upgrade existing system to an adressable system and install notification devices | $5,000 |
| Mar 22, 2013 | Never finaled issued Apr 2013, no final | 316 11th St | Ab Knolling Construction And Contracting | voluntary structural upgrade for (e) pier footings on ground floorDetails
voluntary structural upgrade for (e) pier footings on ground floor | $15,000 |
| Jun 2, 2009 | Completed final sign-off Jun 2009 | 316 11th St | Occidental Express | renew pa# 2008/05/07/1534 to obtain final inspection. all work has been completed.Details
renew pa# 2008/05/07/1534 to obtain final inspection. all work has been completed. | |
| May 7, 2008 | Never finaled issued May 2008, no final | 316 11th St | Occidental Express | removal of stairs from 1st to 2nd floor at center atrium open area. removal of walls at entry/stairs area.Details
removal of stairs from 1st to 2nd floor at center atrium open area. removal of walls at entry/stairs area. | $3,500 |
| May 23, 2005 | Expired or cancelled expired Mar 2007 | 316 11th St | to infill (e) open space in center of 2nd floor & new guardrail on partial open space as per plan.Details
to infill (e) open space in center of 2nd floor & new guardrail on partial open space as per plan. | $25,000 | |
| Aug 29, 2003 | Never finaled issued Aug 2003, no final | 316 11th St | San Francisco Fire Protection | fire suppression sytem installation/hood and duct over kchn equipmentDetails
fire suppression sytem installation/hood and duct over kchn equipment | $2,000 |
| Aug 15, 2003 | Never finaled issued Aug 2003, no final | 316 11th St | H K Fire Protection Inc.* Check I.D. *** | install a ul-300 head & duct fire suppression system to the cooking hood, range guard 2 1/2 gallonDetails
install a ul-300 head & duct fire suppression system to the cooking hood, range guard 2 1/2 gallon | $1,200 |
| Mar 27, 2003 | Completed final sign-off Jul 2004 | 316 11th St | installation of 11 sinks and 5 toilets, there will be minimal partition (drywall/stud)Details
installation of 11 sinks and 5 toilets, there will be minimal partition (drywall/stud) | $15,000 |
Find contractors for work like this