From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 4, 2025 | In progress filed Mar 2025, not yet issued | 199 Valencia St | install seasonal tent and anchors. (temporary)Details
install seasonal tent and anchors. (temporary) | $1,500 | |
| Feb 12, 2024 | Completed final sign-off Feb 2024 | 199 Valencia St | Manny's Roofing Inc | reroofingDetails
reroofing | $20,000 |
| Aug 14, 2018 | Completed final sign-off Jan 2021 | 199 Valencia St | A J O Group Build Inc | soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4 for residential. ref bar area soft-story 201808147342Details
soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4 for residential. ref bar area soft-story 201808147342 | $30,000 |
| Aug 14, 2018 | Completed final sign-off Jan 2021 | 199 Valencia St | A J O Group Build Inc | soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4 for bar area. ref residential soft-story area 201808147344Details
soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4 for bar area. ref residential soft-story area 201808147344 | $30,000 |
| May 18, 2018 | Completed final sign-off Jun 2018 | 199 Valencia St | to obtain final inspection for work approved under pa#200306096546. all work is complete.Details
to obtain final inspection for work approved under pa#200306096546. all work is complete. | ||
| Jun 4, 2013 | Completed final sign-off Aug 2013 | 94 Duboce Av | install grab bars adjacent to water closets. there are 3 water closets in bldg. 2 shower rooms on 2nd floor. 1 toilet room on 2nd floor. 1 shower room on 3rd floor. 1 toilet on 3 floor.min load rating of 250 lbs.Details
install grab bars adjacent to water closets. there are 3 water closets in bldg. 2 shower rooms on 2nd floor. 1 toilet room on 2nd floor. 1 shower room on 3rd floor. 1 toilet on 3 floor.min load rating of 250 lbs. | $2,500 | |
| Sep 21, 2011 | Never finaled issued Nov 2011, no final | 199 Valencia St | R B C General Contractors Inc. | new architectual projection visible from streetDetails
new architectual projection visible from street | $1,600 |
| Jun 28, 2011 | Completed final sign-off Aug 2011 | 199 Valencia St | Pioneer Fire Inc. | as build to sprinkler drawings. revision to 201007196903Details
as build to sprinkler drawings. revision to 201007196903 | |
| May 5, 2011 | Completed final sign-off Sep 2011 | 199 Valencia St | R B C General Contractors Inc. | revision to 201008128655: delete portion of new roof and supporting columns. architectural/structural only. all other trades. not applicableDetails
revision to 201008128655: delete portion of new roof and supporting columns. architectural/structural only. all other trades. not applicable | |
| Oct 25, 2010 | Never finaled issued Oct 2010, no final | 199 Valencia St | street space (will go back to get money)Details
street space (will go back to get money) | ||
| Oct 14, 2010 | Never finaled issued Oct 2010, no final | 199 Valencia St | street space & sidewalkDetails
street space & sidewalk | ||
| Sep 22, 2010 | Never finaled issued Sep 2010, no final | 199 Valencia St | street spaceDetails
street space | ||
| Aug 12, 2010 | Completed final sign-off Sep 2011 | 199 Valencia St | R B C General Contractors Inc. | add new accessible toilet rooms. renovate main bar. miscellaneous structural repair / strengthening. upgrade basement foundation walls / replace floor slab. mep by trade permits. sprinkler & fire alarm under separate permits.Details
add new accessible toilet rooms. renovate main bar. miscellaneous structural repair / strengthening. upgrade basement foundation walls / replace floor slab. mep by trade permits. sprinkler & fire alarm under separate permits. | $200,000 |
| Jul 19, 2010 | Completed final sign-off Sep 2011 | 199 Valencia St | Pioneer Fire Inc. | ground floor -add 10 upright sprinklers, add 6 pendent sprinkler, add 1 dry sidewall sprinklerDetails
ground floor -add 10 upright sprinklers, add 6 pendent sprinkler, add 1 dry sidewall sprinkler | $8,000 |
| Jun 25, 2010 | Completed final sign-off Sep 2011 | 199 Valencia St | R B C General Contractors Inc. | rev.#1 to app. permit appl.#201004089882. delete paving throughout open lot areas, replace with minimal accessible pervious paving. delete (n) exhaust duct riser, re-use (e) duct.Details
rev.#1 to app. permit appl.#201004089882. delete paving throughout open lot areas, replace with minimal accessible pervious paving. delete (n) exhaust duct riser, re-use (e) duct. | |
| May 4, 2010 | Completed final sign-off Sep 2011 | 199 Valencia St | Nationwide Fire Protection | fire suppression system pcl-300 for hood #2.Details
fire suppression system pcl-300 for hood #2. | $2,000 |
| Apr 8, 2010 | Completed final sign-off Sep 2011 | 199 Valencia St | to comply with fire dept. nov# 5688 of 8/12/09 incl. new kitchen exhaust hood and reconfigure fire supression, new disabled access entrance and upgrade existing main entry, reconfigure required exits. public assembly permit. associated work to be performed on 201004160449 and 201004160455Details
to comply with fire dept. nov# 5688 of 8/12/09 incl. new kitchen exhaust hood and reconfigure fire supression, new disabled access entrance and upgrade existing main entry, reconfigure required exits. public assembly permit. associated work to be performed on 201004160449 and 201004160455 | $40,000 | |
| Dec 2, 2009 | Completed final sign-off Sep 2011 | 199 Valencia St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish & install one(1) kidde fire suppression system in the main kitchen area at ground floor.Details
furnish & install one(1) kidde fire suppression system in the main kitchen area at ground floor. | $5,000 |
| Oct 21, 2009 | Never finaled filed Oct 2009, never issued | 199 Valencia St | zeitgeist. verification of occupant load calculations. no construction under this permit.Details
zeitgeist. verification of occupant load calculations. no construction under this permit. | $1,500 | |
| Sep 29, 2009 | Completed final sign-off Nov 2009 | 199 Valencia St | minor dry rot repair on a wood stud on the outside corner. of the building close to foundation. approx 6 inch area. to comply with nov#200922502.Details
minor dry rot repair on a wood stud on the outside corner. of the building close to foundation. approx 6 inch area. to comply with nov#200922502. | $1,000 | |
| Aug 1, 2005 | Expired or cancelled expired Jan 2007 | 199 Valencia St | Northwest Security | add waterflow and shut off switches to alarm systemDetails
add waterflow and shut off switches to alarm system | $500 |
| Jun 9, 2003 | Expired or cancelled expired Mar 2004 | 199 Valencia St | Aaa Restaurant Fire Control/Dba Aaa Fire | install fire sprinkler system per nfpa 13 entire buildingDetails
install fire sprinkler system per nfpa 13 entire building | $20,000 |
| Feb 21, 2001 | Expired or cancelled expired Jun 2001 | 199 Valencia St | sidewalk repairDetails
sidewalk repair |
Find contractors for work like this