Block 3275, lot 003
110 Upland Dr
- City’s use
- Single Family Residential
- Built
- 1951
- Stories
- 2
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 2,526 sq ft
- Lot
- 4,085 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2025 | Completed final sign-off Oct 2025 | 110 Upland Dr | He & Kuang Inc | remodel existing house front water damage stair landing and steps. install new wood membrane and water proofing material tiles facing on the top and new handrail finishedDetails
remodel existing house front water damage stair landing and steps. install new wood membrane and water proofing material tiles facing on the top and new handrail finished | $8,000 |
| Jul 1, 2024 | In progress issued Jul 2024 | 110 Upland Dr | K&H Construction Development Inc | revision to permit#: 202405212573 . exterior stucco replacement add a 3rd wall of house (to the side)Details
revision to permit#: 202405212573 . exterior stucco replacement add a 3rd wall of house (to the side) | $20,000 |
| May 21, 2024 | In progress issued May 2024 | 110 Upland Dr | K&H Construction Development Inc | exterior stucco like for like replacement of the front and one side of the home 3,200 sqft.Details
exterior stucco like for like replacement of the front and one side of the home 3,200 sqft. | $5,000 |
| May 12, 2023 | Completed final sign-off May 2023 | 110 Upland Dr | Moctezuma Roofing Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,500 |
| Aug 7, 2019 | Completed final sign-off Nov 2019 | 110 Upland Dr | Ze Sheng Liao | 1. remodel kitchen, take out the old cabinets, install all new cabinets. new sink, and the stove. 2. remodel bathroom, install new shower, toilet, medicine cabinet sink.Details
1. remodel kitchen, take out the old cabinets, install all new cabinets. new sink, and the stove. 2. remodel bathroom, install new shower, toilet, medicine cabinet sink. | $36,500 |
| May 12, 2017 | Completed final sign-off Jan 2018 | 110 Upland Dr | American Vision Windows | replace 18 windows in living room with ultra fiberglass windows; raise sill height 6" on two windows at east corner non structural remaining 16 same size same locationDetails
replace 18 windows in living room with ultra fiberglass windows; raise sill height 6" on two windows at east corner non structural remaining 16 same size same location | $36,793 |
| Sep 26, 2006 | Never finaled issued Sep 2006, no final | 110 Upland Dr | street space & sidewalk repairDetails
street space & sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.