Block 3260, lot 011
533 Darien Way
- City’s use
- Single Family Residential
- Built
- 1932
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,734 sq ft
- Lot
- 5,079 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2018 | Completed final sign-off May 2018 | 533 Darien Wy | Dissmeyer Corp, Dba Acme Roofing Co | re-roofingDetails
re-roofing | $30,585 |
| Feb 20, 2018 | Completed final sign-off May 2018 | 533 Darien Wy | Lee & Company Contractors Inc | rebuild 11 new existing window sashes to match existing. install new log lighter at fireplace. u factor max. .32Details
rebuild 11 new existing window sashes to match existing. install new log lighter at fireplace. u factor max. .32 | $20,000 |
| Feb 11, 2014 | Never finaled issued Feb 2014, no final | 533 Darien Wy | street space permitDetails
street space permit | ||
| Dec 31, 2013 | Completed final sign-off Mar 2014 | 533 Darien Wy | Bay Concrete Construction | replace existing foundation, volunteer plywood walls according to structural engineering plansDetails
replace existing foundation, volunteer plywood walls according to structural engineering plans | $20,000 |
| Dec 5, 2013 | Completed final sign-off May 2014 | 533 Darien Wy | project proposes interior remodel to the first floor only. scope includes new walls, flooring, plumbing, & lighting, addition of ground floor rear yard deck less than 30".Details
project proposes interior remodel to the first floor only. scope includes new walls, flooring, plumbing, & lighting, addition of ground floor rear yard deck less than 30". | $12,000 | |
| Mar 8, 2012 | Completed final sign-off May 2012 | 533 Darien Wy | Bradford Construction | revision to pa# 2010-1015-3106-remove scope of work-delete ground level deck, access door, utility room & closet on 1st floor (garage level)Details
revision to pa# 2010-1015-3106-remove scope of work-delete ground level deck, access door, utility room & closet on 1st floor (garage level) | |
| Oct 15, 2010 | Completed final sign-off May 2012 | 533 Darien Wy | Bradford Construction | interior remodeling to all floors. new finishes, cabinetry, plmg,& lighting fixtures. addition of rear 2nd floor balcony and ground floor deck. mech, elec, & plmg design to be part of seperate permit.Details
interior remodeling to all floors. new finishes, cabinetry, plmg,& lighting fixtures. addition of rear 2nd floor balcony and ground floor deck. mech, elec, & plmg design to be part of seperate permit. | $125,000 |
| Oct 19, 2005 | Completed final sign-off Dec 2005 | 533 Darien Wy | Gil Construction & Assoc Inc. | repair two existing entrance landing due to faulty membranesDetails
repair two existing entrance landing due to faulty membranes | $8,500 |
| Sep 21, 2000 | Completed final sign-off Oct 2000 | 533 Darien Wy | Safeway Roofing & Siding Co. | reroofingDetails
reroofing | $8,760 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bradford Construction (2), Bay Concrete Construction, Dissmeyer Corp, Dba Acme Roofing Co, Gil Construction & Assoc Inc., Lee & Company Contractors Inc, Safeway Roofing & Siding Co.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.