Block 3198, lot 016
1344 Ocean Ave
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 9
- Rooms
- 21 bedrooms, 9 bathrooms
- Building
- 8,265 sq ft
- Lot
- 3,637 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 20, 2023 | In progress filed Dec 2023, not yet issued | 1344 Ocean Av | revision to permit #202207269286. change in location of the gamma sector. revised eme study due to gamma sector move. replace extg 200a termination/main disconnect with new 600a termination/main disconnect. install conduit/condutors from nw main disconnect to nw 200a 120/240v dish meter panel.Details
revision to permit #202207269286. change in location of the gamma sector. revised eme study due to gamma sector move. replace extg 200a termination/main disconnect with new 600a termination/main disconnect. install conduit/condutors from nw main disconnect to nw 200a 120/240v dish meter panel. | $30,000 | |
| Jul 26, 2022 | Never finaled issued Nov 2022, no final | 1344 Ocean Av | Advanced Wireless & Logistics Inc, The Cbr Group | dish wireless llc to install 3 antennas, 6 rrus and wquip cabinet on rooftop. propsed to install 1 per sector at 3 locations on roof. antennas will be concealed within frp screen wall. both power and fiber lines will be placed in new cable tray on roof top. cable tray will run from equip cabinet toDetails
dish wireless llc to install 3 antennas, 6 rrus and wquip cabinet on rooftop. propsed to install 1 per sector at 3 locations on roof. antennas will be concealed within frp screen wall. both power and fiber lines will be placed in new cable tray on roof top. cable tray will run from equip cabinet to | $68,000 |
| Mar 11, 2022 | Completed final sign-off May 2022 | 1344 Ocean Av | Quality Telecom Consultants | recommencement and completion of work approved under permit 201809059213.Details
recommencement and completion of work approved under permit 201809059213. | $15,000 |
| Feb 14, 2022 | Completed final sign-off Aug 2022 | 1344 Ocean Av | Electric Tech Construction Inc | at&t: swap 9 (e) antennas with 9 new antennas, remove 12 rrus, install 6 rrus, install new barricades and stripping, install 2 battery strings, install 4 rectifiers, install 1 new baseband.Details
at&t: swap 9 (e) antennas with 9 new antennas, remove 12 rrus, install 6 rrus, install new barricades and stripping, install 2 battery strings, install 4 rectifiers, install 1 new baseband. | $25,000 |
| Feb 9, 2022 | Completed final sign-off Apr 2024 | 1344 Ocean Av | Ravig Inc Dba Salient Global Technologi | verizon wireless: replace 6 & add 3 antenna. replace 3 & add 3 rrus. replace 3 oups, add 3 antenna mounts, remove all coax runs, replace 1 & add 2 hybrid cables. at equip room, remove all rrus. replace 1 & add 2 ovps.Details
verizon wireless: replace 6 & add 3 antenna. replace 3 & add 3 rrus. replace 3 oups, add 3 antenna mounts, remove all coax runs, replace 1 & add 2 hybrid cables. at equip room, remove all rrus. replace 1 & add 2 ovps. | $70,000 |
| Dec 15, 2021 | Completed final sign-off Jan 2022 | 1344 Ocean Av | Park Place Contractors | renew permit# 201203206433: to obtain final inspection for work approved under pa# 201203206433. all work is complete.Details
renew permit# 201203206433: to obtain final inspection for work approved under pa# 201203206433. all work is complete. | |
| Dec 18, 2018 | Completed final sign-off Oct 2019 | 1344 Ocean Av | Electric Tech Construction Inc | att modification: r+r 7 (e) antenas w/ 7 (n) antennas; relocate 1 (e) antenna; r+r frp enclusure; install 15 (n) rrus' install other small equip; no change to batteriesDetails
att modification: r+r 7 (e) antenas w/ 7 (n) antennas; relocate 1 (e) antenna; r+r frp enclusure; install 15 (n) rrus' install other small equip; no change to batteries | $34,000 |
| Sep 24, 2018 | Never finaled issued Sep 2018, no final | 1344 Ocean Av | street space and sidewalkDetails
street space and sidewalk | ||
| Sep 5, 2018 | Completed final sign-off May 2022 | 1344 Ocean Av | Quality Telecom Consultants | new conduit install to extg verizon equipment room for future fiber run to be done by others. maintain (e) fire rating for all wall penetrations & floor penetrations tec per sfbcDetails
new conduit install to extg verizon equipment room for future fiber run to be done by others. maintain (e) fire rating for all wall penetrations & floor penetrations tec per sfbc | $18,000 |
| Jan 6, 2017 | Completed final sign-off Feb 2017 | 1344 Ocean Av | Triton Tower Inc | to obtain a final inspection for work already approved under pa# 200009150629, all work is completeDetails
to obtain a final inspection for work already approved under pa# 200009150629, all work is complete | |
| Jan 6, 2017 | Expired or cancelled cancelled Jan 2026 | 1344 Ocean Av | Triton Tower Inc | to obtain a final inspection for work approved under pa# 200009150629, all work is completeDetails
to obtain a final inspection for work approved under pa# 200009150629, all work is complete | |
| Mar 9, 2016 | Completed final sign-off Nov 2016 | 1344 Ocean Av | Electric Tech Construction Inc | modification to an (e)at&t telecom facility including: installing(n) sector a antenna on(e)penthouse,3(n)rru's,(n) cable tray extension w/(n)inner duct fiber & cables,(n)xmu unit,1(n) dc12 surge suppressor in equipment room & (n) frp blinders,also relocating 2(e)tma units.Details
modification to an (e)at&t telecom facility including: installing(n) sector a antenna on(e)penthouse,3(n)rru's,(n) cable tray extension w/(n)inner duct fiber & cables,(n)xmu unit,1(n) dc12 surge suppressor in equipment room & (n) frp blinders,also relocating 2(e)tma units. | $28,000 |
| Aug 4, 2015 | Completed final sign-off Feb 2016 | 1344 Ocean Av | Electric Tech Construction Inc | modification to an (e) at&t mobility wirelessfacility included: removing 2 (e) antennas, r&r 3 antennas, build new 4-foot extension screen wall at ne corner of roof, install 6 new rru's near antennas, install other misc small equipment including surge suppressors & innerduct for fiber/power cables.Details
modification to an (e) at&t mobility wirelessfacility included: removing 2 (e) antennas, r&r 3 antennas, build new 4-foot extension screen wall at ne corner of roof, install 6 new rru's near antennas, install other misc small equipment including surge suppressors & innerduct for fiber/power cables. | $40,000 |
| Jun 30, 2014 | Never finaled issued Jun 2014, no final | 1344 Ocean Av | street spaceDetails
street space | ||
| Aug 13, 2013 | Completed final sign-off Mar 2014 | 1344 Ocean Av | L.D. Strobel Co Ltd | remove and reaplce 3 existing panel for 3 new panel antenna. install 4 new raycap surge protectors, 3 rrh units and install 1 new hybrid cables & 1 ret cable. install 3 new guardrails. verizon wireless.Details
remove and reaplce 3 existing panel for 3 new panel antenna. install 4 new raycap surge protectors, 3 rrh units and install 1 new hybrid cables & 1 ret cable. install 3 new guardrails. verizon wireless. | $10,000 |
| Feb 22, 2013 | Expired or cancelled cancelled Jul 2023 | 1344 Ocean Av | as built reference to app#201203206433. submitting sequence of operations for hyrogen detector. installed under seperate permit.Details
as built reference to app#201203206433. submitting sequence of operations for hyrogen detector. installed under seperate permit. | $1,200 | |
| Mar 20, 2012 | Never finaled issued Jul 2012, no final | 1344 Ocean Av | Park Place Contractors | new communication site on the rooftop. new antennas, new equipment in equipment room, new power + telco routes. installtion of wireless communications facility & roof top antenna. work includes voluntary fire suppression system within equipment room.Details
new communication site on the rooftop. new antennas, new equipment in equipment room, new power + telco routes. installtion of wireless communications facility & roof top antenna. work includes voluntary fire suppression system within equipment room. | $80,000 |
| Nov 5, 2010 | Completed final sign-off Aug 2011 | 1344 Ocean Av | Broken Arrow Communications Inc | a modification to an (e) unmanned telecommunicaiton facility consisting of swapping (6) (e) antennas w/(6)(n) antennas, adding (6) (n) rru's, (3)(n) surge suppressors, a (n) splice box & a (n) 6601 rbs cabinet in an (e) 19" rack, a (n) gps antenna, & (n) innerducts.Details
a modification to an (e) unmanned telecommunicaiton facility consisting of swapping (6) (e) antennas w/(6)(n) antennas, adding (6) (n) rru's, (3)(n) surge suppressors, a (n) splice box & a (n) 6601 rbs cabinet in an (e) 19" rack, a (n) gps antenna, & (n) innerducts. | $42,000 |
| Jul 21, 2010 | Expired or cancelled withdrawn Aug 2015 | 1344 Ocean Av | Solex Contracting Inc | modification to existing unmanned telecommunication facility consisting of installing 1 (n) umts cabinet in e equip room, swap e ve antennas w 3cn antennas, 3 (n) dtmas 1 (n) ret cableDetails
modification to existing unmanned telecommunication facility consisting of installing 1 (n) umts cabinet in e equip room, swap e ve antennas w 3cn antennas, 3 (n) dtmas 1 (n) ret cable | $48,000 |
| Jan 7, 2009 | Completed final sign-off Jan 2010 | 1344 Ocean Av | L.D. Strobel Co Ltd | at & t wireless propose to modify (e) telecom facility. modifications to facility will consist of exchanging positions of 2 (e) antennas in ea of the 3 sectors. installing 6 new coax cables from (e) equipment cabinet to (e) antennas. installing 3 remote electronic tilts (rets) to base of (e) antennaDetails
at & t wireless propose to modify (e) telecom facility. modifications to facility will consist of exchanging positions of 2 (e) antennas in ea of the 3 sectors. installing 6 new coax cables from (e) equipment cabinet to (e) antennas. installing 3 remote electronic tilts (rets) to base of (e) antenna | $5,000 |
| Sep 15, 2000 | Expired or cancelled expired Sep 2001 | 1344 Ocean Av | one-stop,install a wireless telecommunication facility incl 9 panel antenna on roof of a four storyDetails
one-stop,install a wireless telecommunication facility incl 9 panel antenna on roof of a four story | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Electric Tech Construction Inc (4), L.D. Strobel Co Ltd (2), Park Place Contractors (2), Quality Telecom Consultants (2), Triton Tower Inc (2), Advanced Wireless & Logistics Inc, Broken Arrow Communications Inc, Ravig Inc Dba Salient Global Technologi, Solex Contracting Inc, The Cbr Group
- Architects
- Manuel Tsihlas
- Engineers
- James Spore (2), Nasib Pandey (2), Amer Abdel K. Alkloub, Brett Mccomb, Glen Hunt, Larry Strobel
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.