Block 3156, lot 001
149 Detroit St
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 1,520 sq ft
- Lot
- 1,873 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2020 | Completed final sign-off Jul 2021 | 149 Detroit St | Morena Llc /Dba: Tony's Windows & Glass | replace 3 windows on front facade w/ wood windows.Details
replace 3 windows on front facade w/ wood windows. | $1,000 |
| Mar 4, 2019 | Completed final sign-off May 2020 | 149 Detroit St | Tripoli Carpentry And Construction | to obtain a final inspection for work already approved under pa# 200503036733 & 200501072777Details
to obtain a final inspection for work already approved under pa# 200503036733 & 200501072777 | |
| Mar 1, 2019 | Completed final sign-off May 2020 | 149 Detroit St | replacement (e) windows on g/ with new nfrc egress window. voluntary structural upgrades to g/f foundation bolting. new elec, plumb, finishes. 1hr fire wall between garage & conditioned space. new bathroom, bedroom, close & utility space on g/f. upgrade concrete slab on g/f in area of work.Details
replacement (e) windows on g/ with new nfrc egress window. voluntary structural upgrades to g/f foundation bolting. new elec, plumb, finishes. 1hr fire wall between garage & conditioned space. new bathroom, bedroom, close & utility space on g/f. upgrade concrete slab on g/f in area of work. | $40,000 | |
| Oct 15, 2018 | Completed final sign-off May 2020 | 149 Detroit St | Tripoli Carpentry And Construction | replace front wood steps w/ stucco / granite to restore to original design and match majority of neighbors incl footing, framing, stone steps and landings, stuccoDetails
replace front wood steps w/ stucco / granite to restore to original design and match majority of neighbors incl footing, framing, stone steps and landings, stucco | $10,000 |
| May 1, 2006 | Expired or cancelled expired Apr 2007 | 149 Detroit St | renew pa#2005/01/07/2777 & 2005/03/03/6733 for final insp.Details
renew pa#2005/01/07/2777 & 2005/03/03/6733 for final insp. | ||
| Mar 3, 2005 | Expired or cancelled expired Apr 2007 | 149 Detroit St | changes to existing permit not including skylights from org permit, opening wall to recess refrigeraDetails
changes to existing permit not including skylights from org permit, opening wall to recess refrigera | ||
| Jan 7, 2005 | Expired or cancelled expired Apr 2007 | 149 Detroit St | remodel kitchen including new cabinets, countertop, sink, appliances, tile floor., install 2 skylighDetails
remodel kitchen including new cabinets, countertop, sink, appliances, tile floor., install 2 skyligh | $7,000 | |
| Dec 16, 2004 | Expired or cancelled cancelled Nov 2007 | 149 Detroit St | excavate part of garage to create new bedroom. infill overhang at rear yard per plan.Details
excavate part of garage to create new bedroom. infill overhang at rear yard per plan. | $15,000 | |
| Jan 8, 2003 | Never finaled issued Jan 2003, no final | 149 Detroit St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tripoli Carpentry And Construction (2), Morena Llc /Dba: Tony's Windows & Glass
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.