Block 3141, lot 015
238 Staples Ave
- City’s use
- Single Family Residential
- Built
- 1924
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,380 sq ft
- Lot
- 2,812 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 1, 2023 | Completed final sign-off Mar 2023 | 238 Staples Av | Mountain Ridge Construction | revision 202302081647 installation of dowells in e concreteDetails
revision 202302081647 installation of dowells in e concrete | |
| Feb 8, 2023 | Completed final sign-off Apr 2023 | 238 Staples Av | Mountain Ridge Construction | structural revision to permit 202301190375. pour concrete pad 2'4" x 2'4" square. add new post and shim existing post at garage level.Details
structural revision to permit 202301190375. pour concrete pad 2'4" x 2'4" square. add new post and shim existing post at garage level. | $3,600 |
| Jan 19, 2023 | Completed final sign-off Apr 2023 | 238 Staples Av | Mountain Ridge Construction | remove and replace kitchen cabinets/countertops and move sink to east wall. remodel upper bathroom, remove bathrtub, install custom shower pan and tile walls. install new toilet and vianity with new sink. all in same location.Details
remove and replace kitchen cabinets/countertops and move sink to east wall. remodel upper bathroom, remove bathrtub, install custom shower pan and tile walls. install new toilet and vianity with new sink. all in same location. | $30,000 |
| Sep 11, 2017 | Completed final sign-off Jul 2018 | 238 Staples Av | Duffin Construction | replace cabinets, countrtops, flooring in-kind, some location, update erceptacles to code, update lighting to recessed led, re-install sink and faucet in some lation work in kitchen only.Details
replace cabinets, countrtops, flooring in-kind, some location, update erceptacles to code, update lighting to recessed led, re-install sink and faucet in some lation work in kitchen only. | $55,000 |
| Aug 5, 2004 | Completed final sign-off Oct 2004 | 238 Staples Av | Cool Solutions Manufactoring,Inc | renew 200304011210 & 200112175389 for final inspection.Details
renew 200304011210 & 200112175389 for final inspection. | |
| Apr 1, 2003 | Expired or cancelled expired Apr 2010 | 238 Staples Av | rev#200112175389s by sam vellie & tony fong to reduce scope of work to back of houseDetails
rev#200112175389s by sam vellie & tony fong to reduce scope of work to back of house | $1,000 | |
| Aug 9, 2002 | Completed final sign-off Aug 2002 | 238 Staples Av | Jjj & K Inc./Dba: Alexander Company | replace 2 windows, size for size, alum. to vinyl @ front of houseDetails
replace 2 windows, size for size, alum. to vinyl @ front of house | $1,544 |
| Dec 17, 2001 | Never finaled issued Oct 2002, no final | 238 Staples Av | add 2 floor addition to rear . with small deck & patio area. some interior remodel. remodel basementDetails
add 2 floor addition to rear . with small deck & patio area. some interior remodel. remodel basement | $105,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mountain Ridge Construction (3), Cool Solutions Manufactoring,Inc, Duffin Construction, Jjj & K Inc./Dba: Alexander Company
- Engineers
- Dominic Chu, Dominic Shek-Ning Chu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.