Block 3120, lot 046
335 Hearst Ave
- City’s use
- Single Family Residential
- Built
- 1906
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,038 sq ft
- Lot
- 2,809 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 22, 2026 | Completed final sign-off Apr 2026 | 335 Hearst Av | Georgio Atana | remove (e) dry rot siding windows trims repalce with victorian style lapsiding. (n) window trims only facing front of house in kind like for like, replace or add pywood if not existing.Details
remove (e) dry rot siding windows trims repalce with victorian style lapsiding. (n) window trims only facing front of house in kind like for like, replace or add pywood if not existing. | $23,400 |
| Jan 29, 2025 | Completed final sign-off Oct 2025 | 335 Hearst Av | Skyy Builders Inc | in-kind framing repair due to dry rot in rear of bldg.Details
in-kind framing repair due to dry rot in rear of bldg. | $3,000 |
| Jan 20, 2025 | Completed final sign-off Aug 2025 | 335 Hearst Av | 415 Roofing Corp | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| Dec 17, 2024 | Completed final sign-off Oct 2025 | 335 Hearst Av | Skyy Builders Inc | add interior stair to connect 1st & 2nd fl; add master bath, bed & wic on 1st fl; relocate kitchen, add laundry room & powder room on 2nd fl; remodel bath on 3rd floor, alteration/new interior foundation and floor framing. no loss of any dwelling units per section 317 of planning codeDetails
add interior stair to connect 1st & 2nd fl; add master bath, bed & wic on 1st fl; relocate kitchen, add laundry room & powder room on 2nd fl; remodel bath on 3rd floor, alteration/new interior foundation and floor framing. no loss of any dwelling units per section 317 of planning code | $100,000 |
| Dec 3, 2024 | Completed final sign-off Oct 2025 | 335 Hearst Av | Skyy Builders Inc | replace 12 windows, replace wood siding at the back of building, 6 windows at the front to be aluminum clad hung windows. existing fixed windows at front to be replaced as fixed windows.Details
replace 12 windows, replace wood siding at the back of building, 6 windows at the front to be aluminum clad hung windows. existing fixed windows at front to be replaced as fixed windows. | $9,800 |
| Aug 23, 2019 | Expired or cancelled cancelled Oct 2025 | 335 Hearst Av | 2 story rear yard additon roof deck @ 2nd floor, remodel interior including kitchen & bathroomDetails
2 story rear yard additon roof deck @ 2nd floor, remodel interior including kitchen & bathroom | $250,000 | |
| May 25, 2018 | Never finaled issued May 2018, no final | 335 Hearst Av | street spaceDetails
street space | ||
| Sep 24, 2003 | Completed final sign-off Dec 2003 | 335 Hearst Av | remove entirely storage shed at rear yard built without permit.comply w/ citation#200343030.Details
remove entirely storage shed at rear yard built without permit.comply w/ citation#200343030. | $500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.