Block 3046, lot 009
149 San Felipe Ave
- City’s use
- Single Family Residential
- Built
- 1927
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,628 sq ft
- Lot
- 5,845 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2025 | Completed final sign-off Mar 2025 | 149 San Felipe Av | Ru Builders Inc | to obtain final inspection for work approved under pa#: 202205315233 and 202207128239 all work are complete.Details
to obtain final inspection for work approved under pa#: 202205315233 and 202207128239 all work are complete. | |
| Jul 12, 2022 | Expired or cancelled expired Mar 2025 | 149 San Felipe Av | Ru Builders Inc | structrual revision to 202205315233. reduction of scope of work to lateral strengthening in lieu of seismic upgrade of garage level. remove proposed plywood sw between garage doors. reduce sectional foundation installation to 2 phases. remove urfp @ rear retaining wall due to (e) anchors.Details
structrual revision to 202205315233. reduction of scope of work to lateral strengthening in lieu of seismic upgrade of garage level. remove proposed plywood sw between garage doors. reduce sectional foundation installation to 2 phases. remove urfp @ rear retaining wall due to (e) anchors. | |
| May 31, 2022 | Expired or cancelled expired Mar 2025 | 149 San Felipe Av | Ru Builders Inc | strengthen (e) garage level foundations with new doweled concrete wall & footings at north/south perimeter reaining walls. upgrade ground water draininage system. seismic upgrade of garage level with plywood shearwalls/hold downs.Details
strengthen (e) garage level foundations with new doweled concrete wall & footings at north/south perimeter reaining walls. upgrade ground water draininage system. seismic upgrade of garage level with plywood shearwalls/hold downs. | $63,000 |
| May 24, 2022 | Completed final sign-off Dec 2022 | 149 San Felipe Av | Ru Builders Inc | bathroom renovation (in kind) (2 bathrooms)Details
bathroom renovation (in kind) (2 bathrooms) | $48,200 |
| Jun 20, 2013 | Completed final sign-off Nov 2013 | 149 San Felipe Av | Crana Windows & Doors Dba Kevin Mc Laugh | replace 24 windows in kind (wood for wood) into existing frarmes, 3 at frontDetails
replace 24 windows in kind (wood for wood) into existing frarmes, 3 at front | $20,000 |
| May 29, 2013 | Completed final sign-off Jun 2013 | 149 San Felipe Av | Advanced Home Energy Inc. | r-19 denim bath floor insulation.Details
r-19 denim bath floor insulation. | $2,000 |
| Jan 3, 2012 | Completed final sign-off Feb 2012 | 149 San Felipe Av | Flying Colors | ground wate management and footing repairDetails
ground wate management and footing repair | $45,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ru Builders Inc (4), Advanced Home Energy Inc., Crana Windows & Doors Dba Kevin Mc Laugh, Flying Colors
- Engineers
- Alex Santos (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.