Block 3011, lot 062
84 Miraloma Dr
7 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2009 | Never finaled issued Aug 2009, no final | 84 Miraloma Dr | Ruby Plumbing & Electrical | installation new fire sprinkler system to conform with nfpa-13,2002 throughout the bldg total sprinklers 119. | $21,000 |
| May 18, 2009 | Never finaled issued May 2009, no final | 84 Miraloma Dr | revision to 200902111855. patio wall detail at basement level. relocate toilet, add laundry on basement level no exterior changes. | $1,500 | |
| May 18, 2009 | Expired or cancelled withdrawn Aug 2014 | 84 Miraloma Dr | vertical addition for 2 bedroom suites, a library, and a greenhouse. add rear balconies to lower level | $180,000 | |
| Feb 11, 2009 | Never finaled issued Apr 2009, no final | 84 Miraloma Dr | seismic upgrade; fill in partial lower level flr, extend interior stair down to basement level; develope basement into living area includes home theater, mj room & spa; rear windows & doors replace & re-arrangement, same to sizes.seismic design to plan for future 1 story vertical addition. | $200,000 | |
| Feb 9, 2009 | Never finaled issued Feb 2009, no final | 84 Miraloma Dr | interior renovation: relocate interior stairs, kitchen, furnace & laundry room and add full bathroom on garage & lower level | $50,000 | |
| Feb 4, 2009 | Expired or cancelled cancelled Jan 2026 | 84 Miraloma Dr | error 5/18/09-interior renovation: relocated interior stair, kitchen, furnace, water heater & laundry. add a full bath on garage level. | $50,000 | |
| Jul 7, 2008 | Never finaled issued Jul 2008, no final | 84 Miraloma Dr | Electric Current Construction Inc. | remodeling 1 kitchen & 4 bathrooms, no change to door, windows | $60,000 |