Block 2929, lot 006
138 Madrone Ave
- City’s use
- Single Family Residential
- Built
- 1926
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,305 sq ft
- Lot
- 3,998 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 23, 2022 | Never finaled issued Dec 2022, no final | 138 Madrone Av | Bartley Construction | revision to bpa#202211166564 to demo and replace portions (e) bay window inkind.Details
revision to bpa#202211166564 to demo and replace portions (e) bay window inkind. | $20,000 |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 138 Madrone Av | Bartley Construction | replace damaged siding from ground level to top floor as needed due to leaks. replace 3 windows to match in kind south facing bay wall u-factor=0.3maxDetails
replace damaged siding from ground level to top floor as needed due to leaks. replace 3 windows to match in kind south facing bay wall u-factor=0.3max | $15,000 |
| Jul 22, 2021 | Completed final sign-off Apr 2023 | 138 Madrone Av | Bartley Construction | conversion of existing family room located at the ground floor level to junior accessory dwelling unit contained entirely within single family residence. remodel of laundry area located at ground floor level.Details
conversion of existing family room located at the ground floor level to junior accessory dwelling unit contained entirely within single family residence. remodel of laundry area located at ground floor level. | $35,000 |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 138 Madrone Av | Jk Pro Roofing | reroofing. tear off roofing. install app-t base sheet. install gta modified bitumen system.Details
reroofing. tear off roofing. install app-t base sheet. install gta modified bitumen system. | $8,000 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 138 Madrone Av | street spaceDetails
street space | ||
| Jun 1, 2006 | Never finaled issued Jun 2006, no final | 138 Madrone Av | change of addressDetails
change of address | ||
| Jun 22, 2005 | Completed final sign-off May 2006 | 140 Madrone Av | horizontal 2 story addition at rear per plans.Details
horizontal 2 story addition at rear per plans. | $35,000 | |
| Jun 7, 2005 | Completed final sign-off Apr 2006 | 140 Madrone Av | to alter floors, including addition of new bathroom room, to add a guest room, relocate laundry andDetails
to alter floors, including addition of new bathroom room, to add a guest room, relocate laundry and | $15,000 | |
| Jun 7, 2005 | Completed final sign-off Apr 2006 | 140 Madrone Av | to remodel kitchen, two bathroom, replace partial lath/plaster by gypboard and dryrot repair.Details
to remodel kitchen, two bathroom, replace partial lath/plaster by gypboard and dryrot repair. | $80,000 | |
| Sep 3, 2004 | Completed final sign-off Oct 2004 | 140 Madrone Av | Miyako Constr & Roofing Company | reroofingDetails
reroofing | $6,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.