Block 2918, lot 025
632 Laguna Honda Blvd
- City’s use
- Single Family Residential
- Built
- 1927
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,452 sq ft
- Lot
- 5,074 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 26, 2024 | Completed final sign-off Apr 2024 | 632 Laguna Honda Bl | Roofing Logistics | remove (e) window and dispose of. install new vinyl window (u factor 0.27) white. not visible from street. ref bpa# 202403198145Details
remove (e) window and dispose of. install new vinyl window (u factor 0.27) white. not visible from street. ref bpa# 202403198145 | $560 |
| Mar 19, 2024 | Completed final sign-off May 2024 | 632 Laguna Honda Bl | Roofing Logistics | remove 100 sf of stucco. replace dryrot in kind. install new stucco and texture to match existing. remove and reinstall existing windows. northeast wall/not visible from street.Details
remove 100 sf of stucco. replace dryrot in kind. install new stucco and texture to match existing. remove and reinstall existing windows. northeast wall/not visible from street. | $6,000 |
| Feb 20, 2024 | Completed final sign-off May 2024 | 632 Laguna Honda Bl | Roofing Logistics | re-roofingDetails
re-roofing | $31,700 |
| Apr 17, 2018 | Completed final sign-off Feb 2019 | 632 Laguna Honda Bl | Jemico Llc Dba Renewal By Andersen Of Sf | street facing, remove and replace 7 windows, retain existing true divided light, including archway, replacing with e series aluminum wood-clad material, same size, same location. u-factor 0.32.Details
street facing, remove and replace 7 windows, retain existing true divided light, including archway, replacing with e series aluminum wood-clad material, same size, same location. u-factor 0.32. | $19,833 |
| Apr 26, 2017 | Never finaled issued Apr 2017, no final | 632 Laguna Honda Bl | street spaceDetails
street space | ||
| Oct 23, 2014 | Completed final sign-off Feb 2015 | 632 Laguna Honda Bl | Legend Construction | new tile, shower, fan, vanity & w/c on upper level bathroom remodel. no wall or opening layout change. one main light high efficacy & others either controlled by manual on sensor or high efficacy.Details
new tile, shower, fan, vanity & w/c on upper level bathroom remodel. no wall or opening layout change. one main light high efficacy & others either controlled by manual on sensor or high efficacy. | $15,000 |
| Aug 25, 2014 | Completed final sign-off Aug 2014 | 632 Laguna Honda Bl | Excelsior Roofing Company | reroofingDetails
reroofing | $6,400 |
| Mar 7, 2011 | Completed final sign-off Apr 2011 | 632 Laguna Honda Bl | Legend Construction | kitchen remodel: new cabinets, ,counters, and appliances. new vinyl flooring - upgrade electricDetails
kitchen remodel: new cabinets, ,counters, and appliances. new vinyl flooring - upgrade electric | $35,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.