Block 2863, lot 010
244 Magellan Ave
- City’s use
- Single Family Residential
- Built
- 1930
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,799 sq ft
- Lot
- 3,332 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | C & L Construction And Remodeling | increase value on pa# 201401146194 per correction notice dated 8/25/14Details
increase value on pa# 201401146194 per correction notice dated 8/25/14 | $50,000 |
| May 13, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | Pak's Roofing Inc | reroofingDetails
reroofing | $11,500 |
| May 12, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | C & L Construction And Remodeling | revision to appl #2014.0114.6194: re-arrange fixtures layout for master bathroom. relcoate (e) bathroom & add one new bathroom at 3rd floor. upgrade/underpin partial (e) foundation 6'-0" section by seque marked on plan & increase the cost of job.Details
revision to appl #2014.0114.6194: re-arrange fixtures layout for master bathroom. relcoate (e) bathroom & add one new bathroom at 3rd floor. upgrade/underpin partial (e) foundation 6'-0" section by seque marked on plan & increase the cost of job. | $50,000 |
| Feb 13, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | Charles Window & Door/Golden Gate Home I | window sash replacement within existing opennings; from wood to wood composite. divided light casement with sdl to exterior, interior and between glass. arched-top transom at upper floor front. u factor .32Details
window sash replacement within existing opennings; from wood to wood composite. divided light casement with sdl to exterior, interior and between glass. arched-top transom at upper floor front. u factor .32 | $34,000 |
| Jan 14, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | C & L Construction And Remodeling | remodel one (e) bathrm. replace counter, cabinets, sink & flooring at third fl. re-built (e) staircase w/ (n) from 2nd fl to ground fl. remove/rebuilt (e) bedrm, laundry & one full bathrm at ground fl. repair (e) front staircase. replace (e) wood rotten w/ new in kind. (possible damage by water).Details
remodel one (e) bathrm. replace counter, cabinets, sink & flooring at third fl. re-built (e) staircase w/ (n) from 2nd fl to ground fl. remove/rebuilt (e) bedrm, laundry & one full bathrm at ground fl. repair (e) front staircase. replace (e) wood rotten w/ new in kind. (possible damage by water). | $36,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C & L Construction And Remodeling (3), Charles Window & Door/Golden Gate Home I, Pak's Roofing Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.