Block 2845, lot 014
16 Crestline Dr
- City’s use
- Multi-Family Residential
- Built
- 1963
- Stories
- 2
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 10,710 sq ft
- Lot
- 8,781 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2025 | Completed final sign-off May 2025 | 16 Crestline Dr | General Express Construction Dba Roof Ex | re-roofing (torch down). "main roof, second roof and garage roof"Details
re-roofing (torch down). "main roof, second roof and garage roof" | $62,648 |
| May 13, 2024 | Completed final sign-off Aug 2025 | 16 Crestline Dr | San Francisco Fire Protection | replace fire alarm to comply w/sffc 1103.7.6.1 replace (e) facp with new facu. install new aes radio, led matrix annunciator, smoke detectors, manual pulls, monitor modules and horn stroves. install new lf sounders in all units potential sleeping areas to comply w/sffd 1103.7.6.1Details
replace fire alarm to comply w/sffc 1103.7.6.1 replace (e) facp with new facu. install new aes radio, led matrix annunciator, smoke detectors, manual pulls, monitor modules and horn stroves. install new lf sounders in all units potential sleeping areas to comply w/sffd 1103.7.6.1 | $20,000 |
| Jun 28, 2023 | Never finaled filed Jun 2023, never issued | 16 Crestline Dr | Bay Area Electric Company | pillow test. sound level 75 dba. nfpa 72 sections 1103.7.6.1Details
pillow test. sound level 75 dba. nfpa 72 sections 1103.7.6.1 | |
| Mar 21, 2023 | Completed final sign-off Jun 2023 | 16 Crestline Dr | Chun Hung Construction Co Inc. | remove and replace all damaged siding boards on wall of front entrance of house, at 2nd and 3rd floor front, replace vertical wood siding with new vertical wood siding.Details
remove and replace all damaged siding boards on wall of front entrance of house, at 2nd and 3rd floor front, replace vertical wood siding with new vertical wood siding. | $22,000 |
| Feb 17, 2023 | Completed final sign-off Mar 2023 | 16 Crestline Dr | Chun Hung Construction Co Inc. | repair all rotten wood of all eight balconies of building. less than 50%. repair in kind.Details
repair all rotten wood of all eight balconies of building. less than 50%. repair in kind. | $16,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Chun Hung Construction Co Inc. (2), Bay Area Electric Company, General Express Construction Dba Roof Ex, San Francisco Fire Protection
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.