Block 2845, lot 002
88 Crestline Dr
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 2
- Units
- 14
- Rooms
- 14 bathrooms
- Building
- 10,664 sq ft
- Lot
- 9,075 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2017 | Completed final sign-off Nov 2019 | 88 Crestline Dr | Spiers Construction Co. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $40,000 |
| Sep 22, 2016 | Never finaled issued Sep 2016, no final | 88 Crestline Dr | Reed Electric Company Inc Dba Century El | like for like fire alarm replacement.Details
like for like fire alarm replacement. | $5,000 |
| Apr 22, 2014 | Never finaled issued Apr 2014, no final | 88 Crestline Dr | #12- remodel kitchen & bath. kitchen: install kitchen cabinets, counter top, sink & faucet. bath: install vanity cabinet, counter top & sink, reface bath tub, re-tile shower wall, flooring (carpet & tile), painting, remove electric panel, replace outlet & switches, install new light fixtures.Details
#12- remodel kitchen & bath. kitchen: install kitchen cabinets, counter top, sink & faucet. bath: install vanity cabinet, counter top & sink, reface bath tub, re-tile shower wall, flooring (carpet & tile), painting, remove electric panel, replace outlet & switches, install new light fixtures. | $16,000 | |
| Apr 4, 2013 | Completed final sign-off Jun 2013 | 88 Crestline Dr | remodel kitchen and 1 bathroom, change lights, floor to be carpet, wall to be painted. kitchen lighting, wattage min 50% high efficeicy. bathroom lighting shall be high efficacy or controlled by manuel on sersor. no change in wall & opening layout. maintain 1 hour separation between units.Details
remodel kitchen and 1 bathroom, change lights, floor to be carpet, wall to be painted. kitchen lighting, wattage min 50% high efficeicy. bathroom lighting shall be high efficacy or controlled by manuel on sersor. no change in wall & opening layout. maintain 1 hour separation between units. | $18,000 | |
| Jan 29, 2009 | Completed final sign-off Mar 2009 | 88 Crestline Dr | work @ unit# 9 only. replace 11 kitchen cabinets. kitchen 8' x 7'; bath 6' x 8'. replace bathroom cabinet. replace 1 bathroom light flourescent. 1 kitchen light flourescent. replace kitchen countertop. replace kitchen sink. see complaint# 200989002 bid.Details
work @ unit# 9 only. replace 11 kitchen cabinets. kitchen 8' x 7'; bath 6' x 8'. replace bathroom cabinet. replace 1 bathroom light flourescent. 1 kitchen light flourescent. replace kitchen countertop. replace kitchen sink. see complaint# 200989002 bid. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Reed Electric Company Inc Dba Century El, Spiers Construction Co.
- Engineers
- Erevan O'neill
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.