Block 2830, lot 015
4240 24th St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2008 | Completed final sign-off Dec 2008 | 4240 24th St | C P Home Repair Inc | remodel of (e) bathroom. replacement of tub, sink, tile & faucet & fixtures on 2nd floor.Details
remodel of (e) bathroom. replacement of tub, sink, tile & faucet & fixtures on 2nd floor. | $15,000 |
| Feb 2, 2006 | Never finaled issued Feb 2006, no final | 4238 24th St | Ames-Billingsley, Inc. | install 3 replacement wood windows: unit 4240 u-value .38-.52Details
install 3 replacement wood windows: unit 4240 u-value .38-.52 | $4,900 |
| Dec 22, 2004 | Never finaled issued Dec 2004, no final | 4238 24th St | Pearson Construction | replace existing window with french door, same opening, install gas fireplace, direct ventDetails
replace existing window with french door, same opening, install gas fireplace, direct vent | $8,000 |
| Sep 18, 2003 | Completed final sign-off Feb 2004 | 4238 24th St | see 3r report no.3r-3712 bring house/property into compliance with report refers to back house of 2Details
see 3r report no.3r-3712 bring house/property into compliance with report refers to back house of 2 | $2,000 | |
| Sep 18, 2003 | Completed final sign-off Feb 2004 | 4240 24th St | bring house to compliance per inspection report 3r-3712 for condo conversion preliminary work forDetails
bring house to compliance per inspection report 3r-3712 for condo conversion preliminary work for | $2,500 | |
| Sep 5, 2003 | Completed final sign-off Nov 2003 | 4240 24th St | replace shower backing, replce gas range per 3r-3712 dated 6/21/03Details
replace shower backing, replce gas range per 3r-3712 dated 6/21/03 | $3,000 | |
| Jan 14, 2003 | Completed final sign-off Feb 2003 | 4240 24th St | Kelton Construction | install epoxy anchors in foundation, install 1/2' pluywood stiffening panels on accessible basementDetails
install epoxy anchors in foundation, install 1/2' pluywood stiffening panels on accessible basement | $5,000 |
| Oct 11, 2002 | Never finaled issued Aug 2003, no final | 4240 24th St | balconey addition @rear 2/f, lateral addition @ g/f, shed dormer roof add @2/f east facadeDetails
balconey addition @rear 2/f, lateral addition @ g/f, shed dormer roof add @2/f east facade | $50,000 | |
| Jun 5, 2001 | Completed final sign-off Nov 2001 | 4240 24th St | excavate garage to grade, shore structure, replace main beam w/steam beam, finish w/sheet rockDetails
excavate garage to grade, shore structure, replace main beam w/steam beam, finish w/sheet rock | $55,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.