Block 2700, lot 044
117 Caselli Ave
- City’s use
- Single Family Residential
- Built
- 1918
- Stories
- 2
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,720 sq ft
- Lot
- 2,400 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2017 | Never finaled issued Jul 2017, no final | 117 Caselli Av | street spaceDetails
street space | ||
| Jun 30, 2017 | Completed final sign-off Aug 2017 | 117 Caselli Av | A M G Construction | repalce wood siding and casings rear facade in kindDetails
repalce wood siding and casings rear facade in kind | $20,000 |
| Nov 23, 2016 | Completed final sign-off Jun 2017 | 117 Caselli Av | Jjj & K Inc./Dba: Alexander Company | replace (5) wood clad marvin windows in rear. no size change. u-factor less than .32Details
replace (5) wood clad marvin windows in rear. no size change. u-factor less than .32 | $9,022 |
| Feb 24, 2016 | Completed final sign-off Jul 2016 | 117 Caselli Av | Jjj & K Inc./Dba: Alexander Company | replace (4) upper story windows with marvin wood-clad windows in-kind.Details
replace (4) upper story windows with marvin wood-clad windows in-kind. | $5,200 |
| Sep 25, 2014 | Completed final sign-off Oct 2014 | 117 Caselli Av | Sure Roofing Systems/R.O.Choy | reroofingDetails
reroofing | $10,000 |
| May 9, 2013 | Completed final sign-off Jul 2013 | 117 Caselli Av | Mc Gowan Builders | garage floor strengthening. sister joists and strengthen beam. garage is at rear.Details
garage floor strengthening. sister joists and strengthen beam. garage is at rear. | $7,500 |
| Jun 5, 2006 | Completed final sign-off Jun 2006 | 117 Caselli Av | Kelton Construction | optional bsmt retrofit.install 5/8" anchor bolts at 4' spacing in exist perimeter foundation.epoxy set with 7+" imbed & 2" square washers.install plywood stiffening panels on front &side bsmt walls.panels to be 1/2" cdx plywood edge nailed 10d@3" w/ phds holdown hardware in corners,width depends onDetails
optional bsmt retrofit.install 5/8" anchor bolts at 4' spacing in exist perimeter foundation.epoxy set with 7+" imbed & 2" square washers.install plywood stiffening panels on front &side bsmt walls.panels to be 1/2" cdx plywood edge nailed 10d@3" w/ phds holdown hardware in corners,width depends on | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jjj & K Inc./Dba: Alexander Company (2), A M G Construction, Kelton Construction, Mc Gowan Builders, Sure Roofing Systems/R.O.Choy
- Engineers
- Erevan O'neill
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.