Block 2689, lot 014
4779 18th St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 1,113 sq ft
- Lot
- 1,975 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 4779 18th St | demolition of decks at 2nd & 3rd floor at rear of building & exterior rear stair with landing. construction of new decks at 2nd & 3rd floor at rear of building with ladder. change of exterior door to window where landing was demolished.Details
demolition of decks at 2nd & 3rd floor at rear of building & exterior rear stair with landing. construction of new decks at 2nd & 3rd floor at rear of building with ladder. change of exterior door to window where landing was demolished. | $100,000 | |
| Jan 31, 2022 | Completed final sign-off Jul 2024 | 4779 18th St | 2/f: moving partition wall to expand a bathroom. moving a bathtub and install new sink/vanity. add partition wall & door. add closet. move gas stove & modify gas line to follow it. new cabinets & counter in kitchen.Details
2/f: moving partition wall to expand a bathroom. moving a bathtub and install new sink/vanity. add partition wall & door. add closet. move gas stove & modify gas line to follow it. new cabinets & counter in kitchen. | $20,000 | |
| Jul 8, 2021 | Expired or cancelled cancelled Jan 2026 | 4779 18th St | demolition of decks at 2nd and 3rd floors at reare of building. demo exterior stairs from gr to 2nd landing at rear of building. construct new decks at 2nd and 3rd floors at rear of building. ladder at rear of construction of fence to fill in where wall at stair landing was previouslyDetails
demolition of decks at 2nd and 3rd floors at reare of building. demo exterior stairs from gr to 2nd landing at rear of building. construct new decks at 2nd and 3rd floors at rear of building. ladder at rear of construction of fence to fill in where wall at stair landing was previously | $30,000 | |
| Nov 2, 2018 | Completed final sign-off Sep 2019 | 4779 18th St | anchor bolt sill plates to foundation and nail plywood to wood studs in garage. garage is 24'x28'. 3/4" anchors @4'0" o.c. w/ epoxy. 1/2" plywood to garage studs 8d nails @ y" o.c. edge nails long walls @ 2" o.c short walls.Details
anchor bolt sill plates to foundation and nail plywood to wood studs in garage. garage is 24'x28'. 3/4" anchors @4'0" o.c. w/ epoxy. 1/2" plywood to garage studs 8d nails @ y" o.c. edge nails long walls @ 2" o.c short walls. | $5,000 | |
| Aug 15, 2012 | Completed final sign-off Jan 2013 | 4779 18th St | Andrew Mihailovsky | work area: front street of building, remove existing cedar shingles from face, install fiber-cement siding in a faux shingle style in kind. paint new siding.Details
work area: front street of building, remove existing cedar shingles from face, install fiber-cement siding in a faux shingle style in kind. paint new siding. | $5,000 |
| Dec 21, 2009 | Expired or cancelled expired Jan 2013 | 4779 18th St | Jjj & K Inc./Dba: Alexander Company | repl 4 windows size for size some visible from the street with marvin woodclad windows "u" value less than 0.67Details
repl 4 windows size for size some visible from the street with marvin woodclad windows "u" value less than 0.67 | $4,500 |
| May 21, 2001 | Completed final sign-off Aug 2001 | 4779 18th St | Specialized Roofing Co | reroofingDetails
reroofing | $9,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Andrew Mihailovsky, Jjj & K Inc./Dba: Alexander Company, Specialized Roofing Co
- Engineers
- Stephen Ratchye (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.