Block 2655, lot 023
1268 Clayton St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 1,814 sq ft
- Lot
- 2,375 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2022 | Completed final sign-off Oct 2022 | 1268 Clayton St | Crana Windows & Doors Dba Kevin Mc Laugh | replace 6 sets of double hung sashes, wood for wood, same design and operation, true divided light and ogee lugs. all visible from street.Details
replace 6 sets of double hung sashes, wood for wood, same design and operation, true divided light and ogee lugs. all visible from street. | $19,000 |
| Mar 5, 2021 | Completed final sign-off Jun 2021 | 1268 Clayton St | Norcross Building Solutions | partil interior remoel of (e) kitchen incluing cabinets, counters, range hood, elec outlets, switches, lighting. no new appliances. no new plumbing fixtures. no wall removal, no new wall opening. no new (e) wall relocation, lighting shall comply with cec 150.0 (ic) 3Details
partil interior remoel of (e) kitchen incluing cabinets, counters, range hood, elec outlets, switches, lighting. no new appliances. no new plumbing fixtures. no wall removal, no new wall opening. no new (e) wall relocation, lighting shall comply with cec 150.0 (ic) 3 | $12,000 |
| Feb 23, 2016 | Never finaled issued Feb 2016, no final | 1268 Clayton St | street spaceDetails
street space | ||
| May 21, 2015 | Completed final sign-off Dec 2015 | 1268 Clayton St | repairs to extg deck, consisting of replacement of guardrail 2"x 2" pickets to be spaced,no further than 4" apart. some deck surface boards to be replaced with 2"x6" redwood planks. repaired sections constitute less than 50% of deck sturcture.Details
repairs to extg deck, consisting of replacement of guardrail 2"x 2" pickets to be spaced,no further than 4" apart. some deck surface boards to be replaced with 2"x6" redwood planks. repaired sections constitute less than 50% of deck sturcture. | $2,500 | |
| Aug 12, 2011 | Completed final sign-off Sep 2011 | 1268 Clayton St | Occidental Express | to obtain final inspection for work approved under pa 201002045928; all work is completeDetails
to obtain final inspection for work approved under pa 201002045928; all work is complete | |
| Aug 5, 2011 | Completed final sign-off Aug 2011 | 1268 Clayton St | Tom Lee Roofing Inc. | installed 15/32" cd exterior plywood sheating throughout main pitched roof (1,100 sq. ft) 6 inches at edge, 8 inch on field, 10 d-nails.Details
installed 15/32" cd exterior plywood sheating throughout main pitched roof (1,100 sq. ft) 6 inches at edge, 8 inch on field, 10 d-nails. | $1,100 |
| Mar 30, 2011 | Completed final sign-off Aug 2011 | 1268 Clayton St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $17,700 |
| Feb 4, 2010 | Expired or cancelled expired Aug 2011 | 1268 Clayton St | Occidental Express | remove and reinstall closed rail along north side of extg rear deck approx. 16'x10'.Details
remove and reinstall closed rail along north side of extg rear deck approx. 16'x10'. | $1,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Occidental Express (2), Tom Lee Roofing Inc. (2), Crana Windows & Doors Dba Kevin Mc Laugh, Norcross Building Solutions
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.