Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 18 Ord St | Rwr Construction Inc | construct (n) elevator tower serving 3 levels of the site.(n) 21'access tunnel constructed w/ cut & cover method, as well as steel soldier piles & wd lagging. the tunnel will be covered w/(n) fill & conc. flatwork. the elevator shaft will have a conc. hgt of 18.5' & abv grd frm'g hgt of 20.5', glsDetails
construct (n) elevator tower serving 3 levels of the site.(n) 21'access tunnel constructed w/ cut & cover method, as well as steel soldier piles & wd lagging. the tunnel will be covered w/(n) fill & conc. flatwork. the elevator shaft will have a conc. hgt of 18.5' & abv grd frm'g hgt of 20.5', gls | $250,000 |
| Aug 15, 2024 | Completed final sign-off Jun 2025 | 18 Ord St | Sanchez Prime Ventures | remodel 2 bathroomsDetails
remodel 2 bathrooms | $25,000 |
| Aug 5, 2022 | Completed final sign-off Nov 2022 | 18 Ord St | Crana Windows & Doors Dba Kevin Mc Laugh | replace 2 fixed sashes and 8 sets of double hung sashes, wood for wood with ogee lugs, visible from street.Details
replace 2 fixed sashes and 8 sets of double hung sashes, wood for wood with ogee lugs, visible from street. | $19,000 |
| Mar 4, 2020 | Completed final sign-off May 2021 | 18 Ord St | Crana Windows & Doors Dba Kevin Mc Laugh | replace (14) wood sashes, 8 fixed, 5 casement, 1 awning. wood for wood. same design and operation. all visible from streetDetails
replace (14) wood sashes, 8 fixed, 5 casement, 1 awning. wood for wood. same design and operation. all visible from street | $12,000 |
| Mar 18, 2011 | Completed final sign-off Apr 2011 | 18 Ord St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $17,350 |
| Feb 9, 2009 | Never finaled issued Feb 2009, no final | 18 Ord St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Jul 23, 2007 | Completed final sign-off Feb 2009 | 18 Ord St | new siding and exterior trim - repalce damaged windows, replace deteriorated upper stair to top unit, rebuild new stair, new pavement, new handrailsDetails
new siding and exterior trim - repalce damaged windows, replace deteriorated upper stair to top unit, rebuild new stair, new pavement, new handrails | $150,000 | |
| Feb 19, 2003 | Never finaled issued Feb 2003, no final | 18 Ord St | address assignmentDetails
address assignment | ||
| Jun 14, 2002 | Completed final sign-off Mar 2003 | 18 Ord St | remodel downstairs unit, including kitchen and bath, connect 1 bedroom to upstairs unit, demolish eDetails
remodel downstairs unit, including kitchen and bath, connect 1 bedroom to upstairs unit, demolish e | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Crana Windows & Doors Dba Kevin Mc Laugh (2), Rwr Construction Inc, Sanchez Prime Ventures, Tom Lee Roofing Inc.
- Architects
- Brent Mcdonald (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.