Block 2612, lot 019
2412 15th St
- City’s use
- Single Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,458 sq ft
- Lot
- 3,197 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 17, 2023 | Never finaled filed Jan 2023, never issued | 2412 15th St | new bathroom on attic fl. rebuild stairs from 2nd fl to attic fl. kitchen remodelDetails
new bathroom on attic fl. rebuild stairs from 2nd fl to attic fl. kitchen remodel | $50,000 | |
| Aug 14, 2020 | Never finaled filed Aug 2020, never issued | 2412 15th St | Ardo Construction Co. | as built revisions to pa# 201909262755. includes relocation of bathroom wall, new location for new toilet, remove (e) workbench, new location of workbench, replace (e) door w/(n) window, replace (e) double doors w/(n), replace (e) beam w/(n) beam, (n) hot waterheater outside on slab. detached shed.Details
as built revisions to pa# 201909262755. includes relocation of bathroom wall, new location for new toilet, remove (e) workbench, new location of workbench, replace (e) door w/(n) window, replace (e) double doors w/(n), replace (e) beam w/(n) beam, (n) hot waterheater outside on slab. detached shed. | |
| Mar 13, 2020 | Never finaled issued Jan 2021, no final | 2412 15th St | Ardo Construction Co. | adu per ordinance #162-16. new sink, new shower, (1) studio/sleeping areaDetails
adu per ordinance #162-16. new sink, new shower, (1) studio/sleeping area | $12,000 |
| Sep 26, 2019 | Completed final sign-off Mar 2023 | 2412 15th St | Ardo Construction Co. | main house no work. workshop in rear add toilet & sink. remove sheetrock to framing to address dryrot, insulate 5/8 sheetrock, upgrade electrical & plumbingDetails
main house no work. workshop in rear add toilet & sink. remove sheetrock to framing to address dryrot, insulate 5/8 sheetrock, upgrade electrical & plumbing | $35,000 |
| Sep 19, 2019 | Expired or cancelled withdrawn Sep 2019 | 2412 15th St | Ardo Construction Co. | change of use from residential worshop to studio. demo interior framing to studs, electrical and plumbing, insulation. frame to accomadate bath and closets. half wall as divider sheetrock 5'8" wall cabinets and base cabinets bath to non load bearing 5'8". one toilet and sinkDetails
change of use from residential worshop to studio. demo interior framing to studs, electrical and plumbing, insulation. frame to accomadate bath and closets. half wall as divider sheetrock 5'8" wall cabinets and base cabinets bath to non load bearing 5'8". one toilet and sink | $40,000 |
| Dec 10, 2007 | Never finaled issued Dec 2007, no final | 2412 15th St | street space & sidewalk permit.Details
street space & sidewalk permit. | ||
| May 17, 2007 | Expired or cancelled cancelled May 2013 | 2412 15th St | addition & renovation; constructu garage, shore up (e) structure, increase living floor area & rear yard addition. new roof, decks & exterior stairs.Details
addition & renovation; constructu garage, shore up (e) structure, increase living floor area & rear yard addition. new roof, decks & exterior stairs. | $680,000 | |
| Aug 8, 2003 | Expired or cancelled expired Jan 2012 | 2412 15th St | reroofingDetails
reroofing | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ardo Construction Co. (4)
- Architects
- Sanyek Kwong
- Engineers
- Kevin Oconnor
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.