Block 2482, lot 012
2670 15th Ave
- City’s use
- Single Family Residential
- Built
- 1935
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,335 sq ft
- Lot
- 3,345 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 15, 2024 | Completed final sign-off Jan 2025 | 2670 15th Av | Caledonia Plastering & Stucco Inc | revision to 202403016923 add approx 500 sq ft to existing permit. remove stucco and replace in kindDetails
revision to 202403016923 add approx 500 sq ft to existing permit. remove stucco and replace in kind | $5,000 |
| Mar 1, 2024 | Completed final sign-off Jan 2025 | 2670 15th Av | Caledonia Plastering & Stucco Inc | remove exising stucco at the front of the house and replace in kind. approx 500 sq ft.Details
remove exising stucco at the front of the house and replace in kind. approx 500 sq ft. | $20,000 |
| May 5, 2016 | Completed final sign-off Jul 2017 | 2670 15th Av | revision to ref pa 2014 0627 9746: water heater & furnace to remain in garage. modification to interior closet wallDetails
revision to ref pa 2014 0627 9746: water heater & furnace to remain in garage. modification to interior closet wall | ||
| Apr 19, 2016 | Expired or cancelled cancelled Jan 2026 | 2670 15th Av | move furnace and water heater to the garage. relocated powder room door and closet. revision application e201501216217Details
move furnace and water heater to the garage. relocated powder room door and closet. revision application e201501216217 | ||
| Jan 21, 2015 | Completed final sign-off Jul 2017 | 2670 15th Av | structural revision to p.a. #201406279746, ground floor lateral strengthening foundation revision. remove (e) posts in garage and replace with (n) beam.Details
structural revision to p.a. #201406279746, ground floor lateral strengthening foundation revision. remove (e) posts in garage and replace with (n) beam. | ||
| Jun 27, 2014 | Completed final sign-off Jul 2017 | 2670 15th Av | remove & replace (e) foundation. convert rear of unconditioned garage to conditioned living space.Details
remove & replace (e) foundation. convert rear of unconditioned garage to conditioned living space. | $100,000 | |
| Jun 11, 2013 | Completed final sign-off Aug 2013 | 2670 15th Av | Nuco Dba Premier Construction Services | comply with nov #201389722 - new 1 footing as shown as s3.5.1Details
comply with nov #201389722 - new 1 footing as shown as s3.5.1 | $5,000 |
| Mar 8, 2013 | Completed final sign-off Dec 2017 | 2670 15th Av | Nuco Dba Premier Construction Services | emergenvcy shoring permit - install temporary wood beam at 1st floor level (garage) down center of garage to pick up unsupported interior footing. wood manuf beam bolted to 4 post, per nov #201389722.Details
emergenvcy shoring permit - install temporary wood beam at 1st floor level (garage) down center of garage to pick up unsupported interior footing. wood manuf beam bolted to 4 post, per nov #201389722. | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Caledonia Plastering & Stucco Inc (2), Nuco Dba Premier Construction Services (2)
- Architects
- John Ehlert
- Engineers
- Patrick Buscovich, Rodrigo Santos
- Authorized agent-otherss
- Patrick Buscovich
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.