Block 2431, lot 021E
2542 31st Ave
- City’s use
- Single Family Residential
- Built
- 1940
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,500 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 2542 31st Av | Safe Step Walk-In Tub Llc | replace existing tub with a walk in tube, install (1) new 20 amp circuit for the tub outlet, drywall patchDetails
replace existing tub with a walk in tube, install (1) new 20 amp circuit for the tub outlet, drywall patch | $9,500 |
| Nov 14, 2025 | Completed final sign-off Sep 2026 | 2542 31st Av | Jemico Llc Dba Renewal By Andersen Of Sf | replace 9 windows and 1 entry door. 4 street facing, 6 non street facing, (e) vinyl 3 double hung, 2 casement, 2 sliders, 1 casement double, 1 fixed, 1 entry door, (n) fibrex 3 double hung, 2 casement, 2 slider, 1 casement, 1 fixed, 1 entry door. all windows and doors are in kind and same opening.Details
replace 9 windows and 1 entry door. 4 street facing, 6 non street facing, (e) vinyl 3 double hung, 2 casement, 2 sliders, 1 casement double, 1 fixed, 1 entry door, (n) fibrex 3 double hung, 2 casement, 2 slider, 1 casement, 1 fixed, 1 entry door. all windows and doors are in kind and same opening. | $14,050 |
| May 10, 2018 | Never finaled issued May 2018, no final | 2542 31st Av | R B Roofing Co Inc | reroofingDetails
reroofing | $13,800 |
| Nov 7, 2006 | Never finaled issued Nov 2006, no final | 2542 31st Av | sidewalkDetails
sidewalk | ||
| Jun 14, 2006 | Completed final sign-off Nov 2006 | 2542 31st Av | Artcore Construction | remodel upstairs bathroom. update plumbing & electrical. no change in basic layout. repair dryrot @ ceiling in bathroom near roof drain. up to approx 50 sq ft.Details
remodel upstairs bathroom. update plumbing & electrical. no change in basic layout. repair dryrot @ ceiling in bathroom near roof drain. up to approx 50 sq ft. | $13,000 |
| Apr 16, 2003 | Completed final sign-off May 2003 | 2542 31st Av | Barker-O'donoghue Master Bldrs | replace double hung sash window,w/ new @ left in light well,entry way in kind. revision toDetails
replace double hung sash window,w/ new @ left in light well,entry way in kind. revision to | $800 |
| Mar 25, 2003 | Completed final sign-off May 2003 | 2542 31st Av | Barker-O'donoghue Master Bldrs | remove & replace kitchen cabinets,some sheet rock. replacement upgrade electrical adjustment ofDetails
remove & replace kitchen cabinets,some sheet rock. replacement upgrade electrical adjustment of | $12,000 |
| Sep 3, 2002 | Completed final sign-off Oct 2002 | 2542 31st Av | Jjj & K Inc./Dba: Alexander Company | 8 windows to be replaced size for sizeDetails
8 windows to be replaced size for size | $3,995 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Barker-O'donoghue Master Bldrs (2), Artcore Construction, Jemico Llc Dba Renewal By Andersen Of Sf, Jjj & K Inc./Dba: Alexander Company, R B Roofing Co Inc, Safe Step Walk-In Tub Llc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.