Block 2421, lot 023
2591 20th Ave
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,133 sq ft
- Lot
- 2,065 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2022 | Completed final sign-off Oct 2022 | 2591 20th Av | Re-Model Design & Build Co | kitchen like for like. replace plumbing fixtures copper line for fridge. like new.Details
kitchen like for like. replace plumbing fixtures copper line for fridge. like new. | $20,000 |
| Mar 15, 2019 | Completed final sign-off Feb 2021 | 2591 20th Av | revision to pa 2015-0909-6532 not doing kitchen or office remodel. 3rd story stays the sameDetails
revision to pa 2015-0909-6532 not doing kitchen or office remodel. 3rd story stays the same | ||
| Mar 15, 2019 | Expired or cancelled revoked Jun 2019 | 2591 20th Av | revision to 201509096532, not doing kitchen or office remodel, 3rd story stays the sameDetails
revision to 201509096532, not doing kitchen or office remodel, 3rd story stays the same | ||
| Mar 27, 2017 | Completed final sign-off Oct 2017 | 2591 20th Av | Control Fire Inc. | 3rd flr: installment of overhead fire protection sprinkler system for unit addition only, includes path of exit travel. partial coverage of 17 sprinklers requiring 26 gpm @ 34 psi cwm with 2" copper k brazed underground dedicated fire service to 6" cwm on 20th ave. ref 201509096532 s1Details
3rd flr: installment of overhead fire protection sprinkler system for unit addition only, includes path of exit travel. partial coverage of 17 sprinklers requiring 26 gpm @ 34 psi cwm with 2" copper k brazed underground dedicated fire service to 6" cwm on 20th ave. ref 201509096532 s1 | $5,000 |
| Sep 9, 2015 | Completed final sign-off Mar 2021 | 2591 20th Av | 3rd story addition. kitchen remodel. office remodel.Details
3rd story addition. kitchen remodel. office remodel. | $59,696 | |
| Dec 18, 2014 | Completed final sign-off Apr 2015 | 2591 20th Av | Jemico Llc Dba Renewal By Andersen Of Sf | replace 3 windows in kind with anderson wood clad windows.(windows are visible from the street).Details
replace 3 windows in kind with anderson wood clad windows.(windows are visible from the street). | $11,573 |
| Jun 19, 2008 | Completed final sign-off Aug 2008 | 2591 20th Av | remove & replace kitchen cabinets & flooring.Details
remove & replace kitchen cabinets & flooring. | $15,000 | |
| Dec 22, 2004 | Completed final sign-off Mar 2005 | 2591 20th Av | renew appl#200208023020, 200309104338 for final inspectionDetails
renew appl#200208023020, 200309104338 for final inspection | ||
| Sep 10, 2003 | Never finaled issued Sep 2003, no final | 2591 20th Av | changes to original plan per request of bldg. inspector. relocate door from foyer to garage, eliminaDetails
changes to original plan per request of bldg. inspector. relocate door from foyer to garage, elimina | ||
| Nov 15, 2002 | Expired or cancelled expired Jun 2006 | 2591 20th Av | Fms Projects Inc. | increase estimated cost of project from 60,000 to 100,000 for application 200208023020Details
increase estimated cost of project from 60,000 to 100,000 for application 200208023020 | $40,000 |
| Aug 2, 2002 | Expired or cancelled expired Jun 2006 | 2591 20th Av | create a master bedroom in existing lower level, including bath & closet, (e)garage to remainDetails
create a master bedroom in existing lower level, including bath & closet, (e)garage to remain | $60,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.