Block 2135, lot 010
2018 16th Ave
- City’s use
- Single Family Residential
- Built
- 1928
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 3 bathrooms
- Building
- 2,070 sq ft
- Lot
- 3,952 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2018 | Never finaled issued Sep 2018, no final | 2018 16th Av | street spaceDetails
street space | ||
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 2018 16th Av | A K Home Improvement Inc | (e) deck in the back repair & replace less than 50% of the deck & replace one post 4/6 approx 20 sq ft of the deck.Details
(e) deck in the back repair & replace less than 50% of the deck & replace one post 4/6 approx 20 sq ft of the deck. | $3,500 |
| Aug 28, 2017 | Never finaled issued Aug 2017, no final | 2018 16th Av | street spaceDetails
street space | ||
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 2018 16th Av | A K Home Improvement Inc | street space permitDetails
street space permit | |
| May 26, 2017 | Completed final sign-off Sep 2017 | 2018 16th Av | Hughes Plastering, A K Home Improvement Inc | stucco replacement, like for like, no character defining features to be removed. entire building.Details
stucco replacement, like for like, no character defining features to be removed. entire building. | $35,000 |
| Dec 26, 2014 | Never finaled issued Dec 2014, no final | 2018 16th Av | Bay Area Window Pros/Quality Constru | replace 3 windows in kind; marvin wood clad (aluminum cladding) ; proposed grid pattern to match existing grid patternDetails
replace 3 windows in kind; marvin wood clad (aluminum cladding) ; proposed grid pattern to match existing grid pattern | $6,000 |
| Sep 3, 2013 | Completed final sign-off Apr 2014 | 2018 16th Av | Phoenix Construction | 1st & 2nd floor: dry rott repair on front of building. only partial dry rott in front. to comply with markoff report #13635, item 1 only.Details
1st & 2nd floor: dry rott repair on front of building. only partial dry rott in front. to comply with markoff report #13635, item 1 only. | $12,000 |
| Jan 31, 2013 | Completed final sign-off Apr 2014 | 2018 16th Av | all electrical work, plumbing work, partial, new insulation, new drywall, all hvac work. (1) kitchen remodel, (2) full baths, (1) half bath room remodel. lighting to comply with cec 150(k). no change to windowsDetails
all electrical work, plumbing work, partial, new insulation, new drywall, all hvac work. (1) kitchen remodel, (2) full baths, (1) half bath room remodel. lighting to comply with cec 150(k). no change to windows | $35,000 | |
| Jan 22, 2013 | Completed final sign-off Apr 2014 | 2018 16th Av | Bay Area Window Pros/Quality Constru | replace 27 window, 23 windows in rear like for like and aluminum to anlin vinyl, 4 windows in front; changing 3 aluminum sliders to marvin aluminum clad wood casement; 1 picture window not changing; adding straight grid line across top to all 4 front windows. all windows retrofit install. visibleDetails
replace 27 window, 23 windows in rear like for like and aluminum to anlin vinyl, 4 windows in front; changing 3 aluminum sliders to marvin aluminum clad wood casement; 1 picture window not changing; adding straight grid line across top to all 4 front windows. all windows retrofit install. visible | $13,500 |
| Jan 10, 2013 | Completed final sign-off Jan 2013 | 2018 16th Av | Protection Roofing Co, | reroofingDetails
reroofing | $5,000 |
| May 24, 2000 | Completed final sign-off Aug 2000 | 2018 16th Av | 21st Century Home Improvt | reroofingDetails
reroofing | $4,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.