Block 1844, lot 005
1429 09th Ave
- City’s use
- Multi-Family Residential
- Built
- 1962
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,470 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2021 | Completed final sign-off Nov 2021 | 1429 09th Av | Byington Electric Corp | modification of an existing fire alarm system by upgrading to a new facp, upgrade existing devices to be compatible with new facp and provide low frequency sounders in all sleeping areas to provide low frequency sounders in all sleeping areas to comply with sffd code 1103.7.6.1.Details
modification of an existing fire alarm system by upgrading to a new facp, upgrade existing devices to be compatible with new facp and provide low frequency sounders in all sleeping areas to provide low frequency sounders in all sleeping areas to comply with sffd code 1103.7.6.1. | |
| Nov 6, 2020 | Completed final sign-off Jul 2021 | 1429 09th Av | Curran & Associates General Contractors | apt#6: 1 living room, 2 bedrooms, top flr, back street. replace 3(e) windows at rear in-kind with 3 milgard vinyl windows (not visible fro mstreet). no structural work. replace (e)kitchen cabinets in kind.Details
apt#6: 1 living room, 2 bedrooms, top flr, back street. replace 3(e) windows at rear in-kind with 3 milgard vinyl windows (not visible fro mstreet). no structural work. replace (e)kitchen cabinets in kind. | $10,000 |
| Dec 30, 2019 | Never finaled issued Jan 2020, no final | 1429 09th Av | replacement of rear yard retaining walls on north and west property line walls, redwood fence, and 4" concrete slab as shown on plans.Details
replacement of rear yard retaining walls on north and west property line walls, redwood fence, and 4" concrete slab as shown on plans. | $30,000 | |
| May 16, 2017 | Completed final sign-off Sep 2018 | 1429 09th Av | softy story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. building reinforcement on g/f, add (n) ordinary steel moment frame @ front & rear garage opening, (n) grade beam, shear walls, hold downs, anchor sill bolting to foundation.Details
softy story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. building reinforcement on g/f, add (n) ordinary steel moment frame @ front & rear garage opening, (n) grade beam, shear walls, hold downs, anchor sill bolting to foundation. | $50,000 | |
| Sep 18, 2014 | Completed final sign-off Jan 2015 | 1429 09th Av | work in unit #4: update bathroom with new sink and tub, update kitchen with new sink and cabinet, lighting to be high efficacy. new exhaust connect to (e) ducts. no wall modification - no structural.Details
work in unit #4: update bathroom with new sink and tub, update kitchen with new sink and cabinet, lighting to be high efficacy. new exhaust connect to (e) ducts. no wall modification - no structural. | $35,000 | |
| Jun 27, 2012 | Completed final sign-off Aug 2012 | 1429 09th Av | update bathroom with new tub & sinkDetails
update bathroom with new tub & sink | $5,000 | |
| Jun 29, 2010 | Completed final sign-off Jul 2010 | 1429 09th Av | repair and replace wood siding to cement tissue board on north wall ( side property line) not visible from the street.Details
repair and replace wood siding to cement tissue board on north wall ( side property line) not visible from the street. | $4,500 | |
| Jun 4, 2010 | Never finaled issued Jun 2010, no final | 1429 09th Av | street space permitDetails
street space permit | ||
| Dec 4, 2008 | Completed final sign-off Dec 2008 | 1429 09th Av | repair siding-less than 50% (20x25 ft) start of work inspection required to verify validty of complaint#200869309.Details
repair siding-less than 50% (20x25 ft) start of work inspection required to verify validty of complaint#200869309. | $8,000 | |
| Nov 24, 2008 | Completed final sign-off Jun 2009 | 1429 09th Av | work @ unit# 2 only. remove mold infestation & repair water damage. floor & wall. 100 sq. ft.Details
work @ unit# 2 only. remove mold infestation & repair water damage. floor & wall. 100 sq. ft. | $4,000 | |
| Jun 13, 2008 | Completed final sign-off Jul 2008 | 1429 09th Av | apt 3 -update 1 bathroom with new toilet, basin and tub. no change to window, door or wall.Details
apt 3 -update 1 bathroom with new toilet, basin and tub. no change to window, door or wall. | $6,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Byington Electric Corp, Curran & Associates General Contractors
- Engineers
- Hawk Lee, Hawk Lee/ Kevin Kim
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.