Block 1819, lot 039A
1400 35th Ave
- City’s use
- Multi-Family Residential
- Built
- 1944
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 2,048 sq ft
- Lot
- 1,916 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 13, 2024 | Completed final sign-off Mar 2025 | 1400 35th Av | City Fire Protection | provide fire sprinkler system on gr fl and new underground fire service per nfpa 24. ref to 201912270821Details
provide fire sprinkler system on gr fl and new underground fire service per nfpa 24. ref to 201912270821 | $15,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2025 | 1400 35th Av | Hbm Construction Inc | change of use from 2unit r3 to 3unit r-2 occupancy (not an adu)conversion of 1st fl commercial space to standard residential unit. expand (e) 1st fl unit area to include adjacent storage as bedroom, and bathroom. 1st fl voluntary structural strengtheining - front wall add shearwall.Details
change of use from 2unit r3 to 3unit r-2 occupancy (not an adu)conversion of 1st fl commercial space to standard residential unit. expand (e) 1st fl unit area to include adjacent storage as bedroom, and bathroom. 1st fl voluntary structural strengtheining - front wall add shearwall. | $40,000 |
| Jan 3, 2017 | Completed final sign-off Apr 2017 | 1402 35th Av | replace windows. 3 visible from street. 6 not visible from street. all aluminum clad woodDetails
replace windows. 3 visible from street. 6 not visible from street. all aluminum clad wood | $8,000 | |
| Dec 5, 2016 | Completed final sign-off Apr 2017 | 1400 35th Av | remodel kitchen in original locationDetails
remodel kitchen in original location | $10,000 | |
| Oct 30, 2015 | Completed final sign-off Mar 2016 | 1402 35th Av | installation of kitchen cabinets (8). full kitchen remodel.Details
installation of kitchen cabinets (8). full kitchen remodel. | $3,200 | |
| May 17, 2013 | Completed final sign-off Jul 2013 | 1400 35th Av | Trim Fit Constr. - O'reilly Engineering | repair and replace dry rotted exterior deck framing members. less than 50% replacement.Details
repair and replace dry rotted exterior deck framing members. less than 50% replacement. | $4,000 |
| Apr 25, 2011 | Completed final sign-off May 2011 | 1400 35th Av | Trim Fit Constr. - O'reilly Engineering | remove stucco at front entrance & repair dry rot & restucco approx 100 sq ft. repair in kind. no change windows walls or door.Details
remove stucco at front entrance & repair dry rot & restucco approx 100 sq ft. repair in kind. no change windows walls or door. | $5,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Trim Fit Constr. - O'reilly Engineering (2), City Fire Protection, Hbm Construction Inc
- Architects
- Wai C. Mar
- Engineers
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.