Block 1742, lot 002
1219 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,490 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 26, 2025 | Completed final sign-off Aug 2026 | 1219 08th Av | R & C Mulholland Inc. | interior garage level framing alternations per structural plans. remove wall sections, install psl beam, psl posts, blocking and anchorage. all work interior to support new electrical service infrastructure. electrical work under separate permitDetails
interior garage level framing alternations per structural plans. remove wall sections, install psl beam, psl posts, blocking and anchorage. all work interior to support new electrical service infrastructure. electrical work under separate permit | $18,000 |
| Jan 31, 2022 | Never finaled issued Jan 2022, no final | 1219 08th Av | unit 3: install 3 iwc white vinyl double pane windows with screens at the back of the building. non street visible. replace in kindDetails
unit 3: install 3 iwc white vinyl double pane windows with screens at the back of the building. non street visible. replace in kind | $3,800 | |
| Sep 19, 2020 | Completed final sign-off May 2021 | 1219 08th Av | supercede pa #2017-0911-7499: soft story retrofit to comply w/ 2019 sfebc chapter 4d per 2019 cebc appendix a-4 standards.Details
supercede pa #2017-0911-7499: soft story retrofit to comply w/ 2019 sfebc chapter 4d per 2019 cebc appendix a-4 standards. | ||
| Sep 11, 2017 | Completed final sign-off May 2021 | 1219 08th Av | Ray Woo Construction And Consulting Llc | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $90,000 |
| Jun 8, 2009 | Completed final sign-off Jun 2009 | 1219 08th Av | replace existing three skylights as in kind. to comply w/ nov #200876594.Details
replace existing three skylights as in kind. to comply w/ nov #200876594. | $1,680 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- R & C Mulholland Inc., Ray Woo Construction And Consulting Llc
- Engineers
- Alex Santos, Emmanuel Pun, Matthew N Namy
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.