Block 1673, lot 060
5420 Fulton St
- City’s use
- Single Family Residential
- Built
- 1937
- Stories
- 2
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,162 sq ft
- Zoning
- NA
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2017 | Completed final sign-off Sep 2017 | 5420 Fulton St | Rhino Builders Inc | kitchen remodel: remove non-bearing wall. new electrical & plumbing finishes. remove (e) western door to laundry room and infilled/close.Details
kitchen remodel: remove non-bearing wall. new electrical & plumbing finishes. remove (e) western door to laundry room and infilled/close. | $14,000 |
| Jan 5, 2015 | Completed final sign-off May 2015 | 5420 Fulton St | build a new deck (landing). remove existing chimney.Details
build a new deck (landing). remove existing chimney. | $5,400 | |
| Jan 7, 2014 | Completed final sign-off Jun 2015 | 5420 Fulton St | revision to app#201310078654. remodel of extg room, take down fake wood paneling, a new wall relocation. area of work will be at ground floor only. drywall at 1/2" and 5/8" and finish hardwood flooring.Details
revision to app#201310078654. remodel of extg room, take down fake wood paneling, a new wall relocation. area of work will be at ground floor only. drywall at 1/2" and 5/8" and finish hardwood flooring. | ||
| Oct 7, 2013 | Completed final sign-off Jun 2015 | 5420 Fulton St | remodel of existing recreation room at ground floor, take down fake wood paneling & ceiling finish, install drywall & plaster, counter-tops. no new wall and no existing wall relocation. all new sheetrock shall be 5/8" type x gypsum board, new floor finish will be hardwood. no elect & plumbing work.Details
remodel of existing recreation room at ground floor, take down fake wood paneling & ceiling finish, install drywall & plaster, counter-tops. no new wall and no existing wall relocation. all new sheetrock shall be 5/8" type x gypsum board, new floor finish will be hardwood. no elect & plumbing work. | $15,000 | |
| Feb 22, 2013 | Completed final sign-off Mar 2013 | 5420 Fulton St | Fahan Construction | removal of 50 sq.ft. of stucco for repair of dry rot and replacement of new stucco in kind. work on face of building.Details
removal of 50 sq.ft. of stucco for repair of dry rot and replacement of new stucco in kind. work on face of building. | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Fahan Construction, Rhino Builders Inc
- Engineers
- Antonio Prado
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.