Block 1641, lot 057
625 03rd Ave
- City’s use
- Single Family Residential
- Built
- 1915
- Stories
- 2
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,209 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 28, 2023 | Never finaled issued Jun 2023, no final | 625 03rd Av | to obtain final inspection for work approved under pa #201202103947. all work is complete.Details
to obtain final inspection for work approved under pa #201202103947. all work is complete. | ||
| Jul 19, 2022 | Completed final sign-off Jun 2023 | 625 03rd Av | Untitled Labs Inc Dba Made Renovation | revision to permit 202110251082. label closet at the top of the stairs as a dedicated utility/mechanical closet per request of electrical inspector.Details
revision to permit 202110251082. label closet at the top of the stairs as a dedicated utility/mechanical closet per request of electrical inspector. | |
| Jan 26, 2022 | Completed final sign-off Jun 2022 | 625 03rd Av | Jemico Llc Dba Renewal By Andersen Of Sf | replacing 4 windows, non-street visable, on side of home. same size and location with wood composite. max u-factor 0.30 or better.Details
replacing 4 windows, non-street visable, on side of home. same size and location with wood composite. max u-factor 0.30 or better. | $12,955 |
| Oct 25, 2021 | Completed final sign-off Jun 2023 | 625 03rd Av | Untitled Labs Inc Dba Made Renovation | converage existing toilet room with existing 1/2 bath to create full bathby removing interior partion wall. new tub shower, new toilet, new vanity, all fixtures. no structural.Details
converage existing toilet room with existing 1/2 bath to create full bathby removing interior partion wall. new tub shower, new toilet, new vanity, all fixtures. no structural. | $17,000 |
| Apr 4, 2013 | Completed final sign-off Jun 2013 | 625 03rd Av | Colvin Construction Dba A A Construction | kitchen remodel. replace cabinets and appliances.no aleration of partition wall.Details
kitchen remodel. replace cabinets and appliances.no aleration of partition wall. | $12,000 |
| Feb 10, 2012 | Never finaled issued Oct 2012, no final | 625 03rd Av | Colvin Construction Dba A A Construction | remodel/alteration & addition of residence in rh=2 zoning district. deck to be added & living rm extended w/ exterior stairway relocated.Details
remodel/alteration & addition of residence in rh=2 zoning district. deck to be added & living rm extended w/ exterior stairway relocated. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Colvin Construction Dba A A Construction (2), Untitled Labs Inc Dba Made Renovation (2), Jemico Llc Dba Renewal By Andersen Of Sf
- Authorized agent-otherss
- Tory Newman
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.