Block 1640, lot 053
300 Cabrillo St
- City’s use
- Multi-Family Residential
- Built
- 1917
- Stories
- 3
- Units
- 10
- Rooms
- 19 bedrooms, 10 bathrooms
- Building
- 10,810 sq ft
- Lot
- 4,750 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 1, 2023 | Completed final sign-off Mar 2024 | 300 Cabrillo St | Bay Alarm Company | comply with 1103.7.6.1 ordinance for low frequency sounders in sleeping area. no other changes to existing system. matrix is unchangedDetails
comply with 1103.7.6.1 ordinance for low frequency sounders in sleeping area. no other changes to existing system. matrix is unchanged | $5,200 |
| Feb 16, 2023 | Never finaled issued Feb 2023, no final | 300 Cabrillo St | to verify (e) sound levels in all sleeping areas to comply with sffc section 1103.7.6.1.Details
to verify (e) sound levels in all sleeping areas to comply with sffc section 1103.7.6.1. | ||
| Feb 25, 2022 | Completed final sign-off Mar 2022 | 300 Cabrillo St | Bay Alarm Company | emergency replacement of (e) local fire alarm failing system on a like for like basis. added cellular communication as an upgrade.Details
emergency replacement of (e) local fire alarm failing system on a like for like basis. added cellular communication as an upgrade. | $2,300 |
| Aug 9, 2016 | Completed final sign-off Dec 2017 | 300 Cabrillo St | Curran & Associates General Contractors | soft story compliance method 2012 iebc app 4a mandatory seismic retrofit chapter 34 b. building reinv9orcement on gr fl, new foundation, sill anchors, shear clips to diaphragm shear walls and hold downs per planDetails
soft story compliance method 2012 iebc app 4a mandatory seismic retrofit chapter 34 b. building reinv9orcement on gr fl, new foundation, sill anchors, shear clips to diaphragm shear walls and hold downs per plan | $80,000 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 300 Cabrillo St | street space permit only.Details
street space permit only. | ||
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 300 Cabrillo St | street space permitDetails
street space permit | ||
| Jun 13, 2007 | Never finaled issued Jun 2007, no final | 300 Cabrillo St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Alarm Company (2), Curran & Associates General Contractors
- Engineers
- Hawk Lee
- Authorized agent-otherss
- Michael Carter
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.