Block 1635, lot 011
679 09th Ave
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 3
- Units
- 2
- Rooms
- 3 bathrooms
- Building
- 4,392 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
2 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 6, 2024 | Completed final sign-off Jun 2024 | 679 09th Av | Ckg Building Construction | remove (e) built up roof. replace all roof flashing. scupper drain, vent pipe flashing, roof flashing vents. install one layer of #28 lb figerglass base sheet. torch down one layer of modified bitumen base sheet and one layer of modified bitumen graniular. apply one coat of aluminim roof coating.Details
remove (e) built up roof. replace all roof flashing. scupper drain, vent pipe flashing, roof flashing vents. install one layer of #28 lb figerglass base sheet. torch down one layer of modified bitumen base sheet and one layer of modified bitumen graniular. apply one coat of aluminim roof coating. | $15,000 |
| May 30, 2007 | Completed final sign-off May 2008 | 679 09th Av | Winson Const & Elec Co | add interior stairs from 2nd fl closet area to g/f, add 2 bathrooms and a bath at g/fDetails
add interior stairs from 2nd fl closet area to g/f, add 2 bathrooms and a bath at g/f | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ckg Building Construction, Winson Const & Elec Co
- Engineers
- Tony Fong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.