Block 1607, lot 022B
708 38th Ave
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 6
- Rooms
- 7 bathrooms
- Building
- 7,425 sq ft
- Lot
- 4,499 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2025 | In progress issued Jul 2025 | 708 38th Av | Home Improvement Company | exterior repairs: paint front and sides. install hardi plants at the side above garage (not visible) and fix the damaged wood siding, trims and around windows.Details
exterior repairs: paint front and sides. install hardi plants at the side above garage (not visible) and fix the damaged wood siding, trims and around windows. | $10,000 |
| Feb 23, 2018 | Expired or cancelled cancelled Jan 2026 | 3643 Balboa St | Steve's Awning | erect non electric wall signDetails
erect non electric wall sign | $600 |
| Oct 31, 2016 | Never finaled issued Oct 2016, no final | 708 38th Av | Jingyue Zhang Construction | clarification to building application 2016-09-26-8823: address correction from 3643 balboa st. to 708 38th ave.Details
clarification to building application 2016-09-26-8823: address correction from 3643 balboa st. to 708 38th ave. | |
| Sep 26, 2016 | Never finaled issued Sep 2016, no final | 3643 Balboa St | Jingyue Zhang Construction | demolishing the tile floor, old cabinets and countertop. install new tile floor, new cabinet, countertop and sink. change outlet. no change on walls.Details
demolishing the tile floor, old cabinets and countertop. install new tile floor, new cabinet, countertop and sink. change outlet. no change on walls. | $4,500 |
| Mar 5, 2012 | Completed final sign-off Mar 2012 | 708 38th Av | Home Improvement Company | replace less 50% of rot damaged existing wood stairs, in kind located in rear of bldg: install pt material, handrails ballusters in kind, stairway serves only residentialDetails
replace less 50% of rot damaged existing wood stairs, in kind located in rear of bldg: install pt material, handrails ballusters in kind, stairway serves only residential | $1,800 |
| Mar 3, 2009 | Completed final sign-off Apr 2009 | 3643 Balboa St | Duka General Const. | to make (e) restroom accessible . restroom cleareance 32"w. wheel chair 60" round. lavatory relocating. provide grab bar hardware. provide door mounted signage & wall mounted signage.Details
to make (e) restroom accessible . restroom cleareance 32"w. wheel chair 60" round. lavatory relocating. provide grab bar hardware. provide door mounted signage & wall mounted signage. | $17,000 |
| Jun 18, 2004 | Never finaled issued Jun 2004, no final | 3643 Balboa St | occupant load calculation only per fire inspector's requirementsDetails
occupant load calculation only per fire inspector's requirements | ||
| Mar 8, 2001 | Expired or cancelled expired Sep 2001 | 3643 Balboa St | Vip Roofing And Construction Co. | reroofingDetails
reroofing | $10,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Home Improvement Company (2), Jingyue Zhang Construction (2), Duka General Const., Steve's Awning, Vip Roofing And Construction Co.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.