Block 1550, lot 031
578 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,950 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 27, 2022 | Completed final sign-off Jul 2023 | 578 08th Av | unit 578: remove tiles to check for sound coming from floor boards in bath. unit 580: remove tub and install walking in shower. install new tiles and kitchen cabinets. patch/repair in kind.Details
unit 578: remove tiles to check for sound coming from floor boards in bath. unit 580: remove tub and install walking in shower. install new tiles and kitchen cabinets. patch/repair in kind. | $10,000 | |
| Nov 26, 2013 | Completed final sign-off Dec 2013 | 578 08th Av | Advanced Home Energy Inc. | install high efficiency furnace and duct upgrade (r-8) in upper unit; same work in lower unit; and install attic insulation (r-38) in upper unit attic.- blown in celluloseDetails
install high efficiency furnace and duct upgrade (r-8) in upper unit; same work in lower unit; and install attic insulation (r-38) in upper unit attic.- blown in cellulose | $16,000 |
| Dec 5, 2011 | Completed final sign-off Feb 2012 | 578 08th Av | Ore-Con | install new tile in bath shower, floor & walls, install 3- 20 amp circuits for kitchen counter, relocate kitchen sink & add a wet bar sink to comply with nov #201173873, 201173874 & 20117383. kitchen lighting per cec 150(k)8 & bathroom lighting per cec150(k)10.Details
install new tile in bath shower, floor & walls, install 3- 20 amp circuits for kitchen counter, relocate kitchen sink & add a wet bar sink to comply with nov #201173873, 201173874 & 20117383. kitchen lighting per cec 150(k)8 & bathroom lighting per cec150(k)10. | $5,000 |
| Sep 3, 2009 | Completed final sign-off Oct 2009 | 578 08th Av | Eric Wong | repair (e) dry rot on exterior rear staircase in kind, less than 50%Details
repair (e) dry rot on exterior rear staircase in kind, less than 50% | $1,900 |
| Nov 4, 2004 | Completed final sign-off Dec 2004 | 578 08th Av | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $19,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.