Block 1498, lot 011
543 46th Ave
- City’s use
- Single Family Residential
- Built
- 1936
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,849 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2025 | In progress issued Aug 2025 | 543 46th Av | Blackstone Development Inc | revision 202506168748- adding interior wall in the garage to create a storage closet, new layout for living room, kitchenette, and bathroom on 1st floorDetails
revision 202506168748- adding interior wall in the garage to create a storage closet, new layout for living room, kitchenette, and bathroom on 1st floor | $12,000 |
| Jun 16, 2025 | In progress issued Jun 2025 | 543 46th Av | Blackstone Development Inc | master bath and closet remodel. master bedroom remodel. new ductwork and new sheetrock in garage. (e) in-kind like for like.Details
master bath and closet remodel. master bedroom remodel. new ductwork and new sheetrock in garage. (e) in-kind like for like. | $218,254 |
| Nov 17, 2008 | Completed final sign-off Apr 2009 | 543 46th Av | revision to pa# 2008-0822-9875-replacement of rotted wall framing, sink, shower, toilet in lower level bathroom. electrical & plumbing will be replaced/repaired as needed.Details
revision to pa# 2008-0822-9875-replacement of rotted wall framing, sink, shower, toilet in lower level bathroom. electrical & plumbing will be replaced/repaired as needed. | $2,500 | |
| Aug 22, 2008 | Completed final sign-off Apr 2009 | 543 46th Av | new deck at rear of house, new plywood, siding at rear/voluntary upgrade.Details
new deck at rear of house, new plywood, siding at rear/voluntary upgrade. | $5,000 | |
| Dec 9, 2005 | Completed final sign-off Aug 2006 | 543 46th Av | interior remodel of kitchen & bathroom. remove exist non-load bearing partitions in bathroom. remove & replace of existing fixtures.Details
interior remodel of kitchen & bathroom. remove exist non-load bearing partitions in bathroom. remove & replace of existing fixtures. | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Blackstone Development Inc (2)
- Engineers
- Christopher Durkin (2)
- Authorized agent-otherss
- Curtis Hollenbeck
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.