Block 1439, lot 034
330 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 2
- Rooms
- 5 bedrooms, 2 bathrooms
- Building
- 3,118 sq ft
- Lot
- 3,240 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Aug 2026 | 330 08th Av | Occidental Express | revision to adu pa# 202210194715 reconfigurating furnace location of 2nd floor adu.Details
revision to adu pa# 202210194715 reconfigurating furnace location of 2nd floor adu. | |
| Aug 30, 2024 | In progress filed Aug 2024, not yet issued | 330 08th Av | erect 2 story type v-b single dwelling detached adu at rear (r-3)Details
erect 2 story type v-b single dwelling detached adu at rear (r-3) | $175,000 | |
| Oct 19, 2022 | In progress issued Mar 2026 | 330 08th Av | Level 8 Construction Inc, Kl Construction Group | two new accessory dwelling in 2nd floor, per ordinance 162-16Details
two new accessory dwelling in 2nd floor, per ordinance 162-16 | $100,000 |
| Jun 13, 2022 | Expired or cancelled withdrawn Aug 2022 | 330 08th Av | addition of one adu unit at the second floor per the local adu program.Details
addition of one adu unit at the second floor per the local adu program. | $50,000 | |
| May 17, 2022 | Expired or cancelled withdrawn Aug 2022 | 330 08th Av | first flr - legalize existing illegal unit per ord 43-14.Details
first flr - legalize existing illegal unit per ord 43-14. | $50,000 | |
| May 19, 2008 | Completed final sign-off May 2008 | 332 08th Av | removal of wall & finishes in dining rm, 2 bedrms, ceiling & wall in living rm also includes major rewiring. inspections correction notice. revise pa#200711137886 per correction notice. (if more than 2/3 of wall coverings being removed then seismic upgrade required)increase valuation $7,500Details
removal of wall & finishes in dining rm, 2 bedrms, ceiling & wall in living rm also includes major rewiring. inspections correction notice. revise pa#200711137886 per correction notice. (if more than 2/3 of wall coverings being removed then seismic upgrade required)increase valuation $7,500 | $7,500 | |
| Nov 13, 2007 | Completed final sign-off May 2008 | 332 08th Av | interior remodel of existing kitchen,add a window in kitchen area. change fixtures at bath & toilet, infill doorway, relocate kitchen entry.Details
interior remodel of existing kitchen,add a window in kitchen area. change fixtures at bath & toilet, infill doorway, relocate kitchen entry. | $28,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.