Block 1428, lot 058
250 06th Ave
- City’s use
- Single Family Residential
- Built
- 1902
- Stories
- 3
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,299 sq ft
- Zoning
- RH2
- Construction type
- WOO
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 7, 2022 | Completed final sign-off Jul 2022 | 250 06th Av | Leo's Construction Co | replace 5 windows (mildgar vinyl tuscany) same size same location. back of the property. u = .30 maxDetails
replace 5 windows (mildgar vinyl tuscany) same size same location. back of the property. u = .30 max | $3,000 |
| Aug 16, 2018 | Completed final sign-off Aug 2018 | 250 06th Av | revision to pa 2017-0914-8231 revise the approved bath room plan on ground floorDetails
revision to pa 2017-0914-8231 revise the approved bath room plan on ground floor | $500 | |
| Sep 14, 2017 | Completed final sign-off Aug 2018 | 250 06th Av | existing storage to playroom and enclosure the ground floor space under kitchen and breakfast area for unit 250 6th av; enclose (e) lightwell on the north side with 9'-10" in height. 1 story for new bathroom on ground floor for unit #250.Details
existing storage to playroom and enclosure the ground floor space under kitchen and breakfast area for unit 250 6th av; enclose (e) lightwell on the north side with 9'-10" in height. 1 story for new bathroom on ground floor for unit #250. | $50,000 | |
| Mar 20, 2006 | Completed final sign-off Jun 2006 | 250 06th Av | 21st Century Home Improvt | repair exterior siding at ear & south east of building install new waterproofing membrane.Details
repair exterior siding at ear & south east of building install new waterproofing membrane. | $19,000 |
| Aug 31, 2004 | Completed final sign-off Oct 2004 | 250 06th Av | London Chimney Services Inc | factory built zero clearance (installation of model romany by robinson willer includes all metalbestDetails
factory built zero clearance (installation of model romany by robinson willer includes all metalbest | $3,000 |
| Dec 15, 2003 | Completed final sign-off Oct 2004 | 250 06th Av | kitchen remodel, garage entrance remodel, new windows at rear facade only & lightwell(not vis frm stDetails
kitchen remodel, garage entrance remodel, new windows at rear facade only & lightwell(not vis frm st | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- 21st Century Home Improvt, Leo's Construction Co, London Chimney Services Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.