Block 1390, lot 003A
279 30th Ave
- City’s use
- Single Family Residential
- Built
- 1921
- Stories
- 2
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 2,582 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2011 | Completed final sign-off Mar 2012 | 279 30th Av | Milford Construction | enlarge existing door opening and infill existing window opening in rear wall. replace damaged rear deck. no change to square footage or location of deckDetails
enlarge existing door opening and infill existing window opening in rear wall. replace damaged rear deck. no change to square footage or location of deck | $6,800 |
| Sep 16, 2011 | Completed final sign-off Mar 2012 | 279 30th Av | Milford Construction | replace wood beam and rotted framing in ceiling of 1st floor study room. no changes to building envelope. no architectural changes.Details
replace wood beam and rotted framing in ceiling of 1st floor study room. no changes to building envelope. no architectural changes. | $12,000 |
| May 8, 2007 | Completed final sign-off Jun 2007 | 279 30th Av | Daniel Harder Landscape | renew pa#200505041529 for final inspection.Details
renew pa#200505041529 for final inspection. | |
| Mar 14, 2007 | Completed final sign-off Apr 2007 | 279 30th Av | Artcore Construction | cap rear of house 6' foundation, cap front of house, 6' foundation by the stairs.Details
cap rear of house 6' foundation, cap front of house, 6' foundation by the stairs. | $5,000 |
| Jan 3, 2006 | Completed final sign-off May 2006 | 279 30th Av | Bay Area General Const | total remodel of hallway upstairs bathroom. remove & repair 2 skylites. 1 in bathroom ceiling & 1 in stair hallway ceiling.Details
total remodel of hallway upstairs bathroom. remove & repair 2 skylites. 1 in bathroom ceiling & 1 in stair hallway ceiling. | $14,000 |
| May 4, 2005 | Expired or cancelled expired Jun 2007 | 279 30th Av | Daniel Harder Landscape | retaining wall that has cracked, to take out the (e) wall and reconstruct it in the same location soDetails
retaining wall that has cracked, to take out the (e) wall and reconstruct it in the same location so | $6,800 |
| Aug 19, 2004 | Completed final sign-off Sep 2004 | 279 30th Av | Bay Area General Const | remove stucco wall from entry way & otherside. repair dryrot frame 200 sq ft. not visible fr street.Details
remove stucco wall from entry way & otherside. repair dryrot frame 200 sq ft. not visible fr street. | $2,000 |
| Nov 15, 2001 | Completed final sign-off Jun 2002 | 279 30th Av | Artco Remoldeling & Construction | repair dry rot @ basementDetails
repair dry rot @ basement | $11,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Area General Const (2), Daniel Harder Landscape (2), Milford Construction (2), Artco Remoldeling & Construction, Artcore Construction
- Engineers
- Paul Chan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.